Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2013-23
Add to Favorite Get Latest Update

The through survey plan of new jack shaft system about TISCO Jianshan iron ore

MA Li ( TISCO Mineral Co. Engineering Department,Taiyuan 030027,China)  
From the accuracy and engineering demands,the paper undertakes the analysis of the through survey plan of new jack shaft system of TISCO Jianshan iron ore,sums up the key technical points for the through plan,and points out some precautions and measures to ensure the accuracy in the through process,so as to ensure the common implementation of the system.
【CateGory Index】: TD175.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Song Fusheng(Huolinhe Opencut Coal Industry Corporation Limited of Inner Mongolia,Inner Mongolia 029200,China);Application of RTK Technology in Checking and Accepting Survey of Strip Mine's Stope[J];Journal of Beijing Polytechnic College;2008-01
2 CUI Xu-sheng(Geo-information Technology and Science Department,Huaihai Institute of Technology,Lianyungang 222001,China);Discussion on Teaching Reformation of Underground Engineering Surveying[J];Beijing Surveying and Mapping;2006-04
3 GAO Shao-wei Beijing Polytechnic College,Beijing,100042;Practice of Laser Plummet Apparatus Upward Point in Subway Tunnel Project[J];Beijing Surveying and Mapping;2008-02
4 HUANG Chun-rong (Fujian Province Panluo Iron Mine, Fujian Longyan 364405, China);Error Analysis and Application in the Downhole Measurement of Laser Pointer[J];Beijing Surveying and Mapping;2009-04
5 ZHAO Qiang,WANG Lin (1.The department Geography and Environmental Science,Suzhou University,Suzhou 234000,China,2.Technical service station of Yongqiao Land and Resources Bureau,Suzhou 234000,China);Three Holes Though Survey of Hongliulin Mine[J];Beijing Surveying and Mapping;2010-01
6 CHEN Qiang-wen (Guizhou Geology and Mineral Resources Bureau of Surveying and Mapping Institute,Guiyang,Guizhou 550018,China);Application of RTK Technology in Mine Terrain Survey Work[J];Beijing Surveying and Mapping;2011-03
7 TIAN Da-ming (Yunnan Phosphate Chemical Group Co.,Ltd.,Kunming,Yunnan,650600,China);The Digital Electron Map in Opencast Phosphorus Mine Survey[J];Beijing Surveying and Mapping;2011-03
8 YANG Ying-wei(Benxi mining co.,Ltd 117003,China);TheInfluence of Horizontal Plane Instead of Geoid in Holing Through Survey of Two Shafts[J];Beijing Surveying and Mapping;2011-04
9 ZHAO Da-jiang(Shandong Jinling Iron Mine,Zibo Shandong 255000,China);The Inclined Shaft Extending Run-through Measurement Summary of Houzhuang Mine in-340m Level[J];Beijing Surveying and Mapping;2012-01
10 ZHANG Cheng-xiao,GU He-he (School of Environmental Science and Spatial Informatics,China University of Mining and Technology,JiangSu XuZhou 221008);Project Designing and Error Prediction on Holing through Survey in Modern Mine[J];Beijing Surveying and Mapping;2012-02
China Proceedings of conference Full-text Database 4 Hits
1 HAN Zu-yan(Yongping Copper Mine of Jiangxi Copper Co.,Ltd.,Qianshan,Jiangxi 334506,China));Discussions on Construction and Process Control for Capital Construction of the Change from Open Pit to Underground Mining in Yongping Copper Mine[A];[C];2011
2 Guo Jun (Yunnan Yuxi Dahongshan Mining Co.,Ltd.);Application of Gyroscope Orientation in Kunsteel Dahongshan Iron Mine[A];[C];2009
3 CAO Si-wen ZHANG min SHAO Ming-xi (Yangcun Coalmine,Yanzhou Coal Group Corporation,Yanzhou shandong 272118,China);Movement and Deformation Regularities of Fully-mechanized Stripe Mining Face with Thick Unconsolidated Stratum[A];[C];2007
4 WANG Jun,HUANG Si-yuan (Thirty-Sixth Project Department of Chinese Coal,Suzhou City,Suzhou Anhui 234000,China);EXCEL Calculate in Through Sub Wire[A];[C];2012
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved