Guandi mine dangerous renovation project piles encounters gob construction technology

CHENG Chun-lan;Xishan Coal Electricity Construction Engineering Group Co.,Ltd;  
Guandi mine production scheduling center dangerous renovation project piles encounters gobs of construction problems,focusing on the process,the construction operation points,quality control and safety,environmental protection measures and other aspects of the construction of content. Practice shows that in the gob pile construction,must be combined with the actual situation,based on a combination of factors such as geology,select a reasonable construction method,can ensure the smooth construction of pile foundation.
【CateGory Index】: TU753.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 DANG Yan-feng(CCCC Second Harbor Engineering Co.,Ltd.,Wuhan 430040,China);Complexities of Large Diameter Bored Pile Construction under Complex Geological Condition and The Dealing Measures[J];World Bridges;2013-03
【Secondary Citations】
Chinese Journal Full-text Database 8 Hits
1 CUI Tian-bao(Zhengzhou Zhongyuan Railway Construction Engineering Supervision Co.,Ltd.,Zhengzhou 450052,China);Construction Techniques for Long and Large Bored Piles of Main Bridge of Zhengzhou Huanghe River Rail-cum-Road Bridge[J];World Bridges;2011-01
2 DONG Gao-chao(China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China);Construction Technique for Bored Piles under the Action of Train Vibration of a Flat-Slab Continuous Rigid Frame Bridge across Busy Railway Lines[J];World Bridges;2012-03
3 JIN Hong-yan(The 5th Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group,Jiujiang 332001,China);Rapid Construction Technique for Large Diameter Bored Pile in Deep Water Area and under Complex Geological Condition[J];World Bridges;2012-05
4 Wang Jun(Tongling Jiangnan Geotechnical Engineering Co.,ltd.,Tongling 244033,China);Boring Features and Techniques of the Bored Pile in Special Stratums[J];Anhui Architecture;2008-01
5 SUN Yi-jun, YIN Qi-liang (Shandong Provincial Institute of Water Conservancy Survey and Design, Jinan 250013, China);Formation of Large Diameter Bored Pile Holes in Complicated Geological Conditions[J];Bridge Construction;2004-06
6 YAN Sheng-hua1,CHEN Long-jian1,MENG Qing-hao2(1.Machinery Leasing Company,China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China;2.Construction Headquarters of Jiashao River-Crossing Bridge Project,Shaoxing 312366,China);Construction of Bored Holes of φ3.8 m Very Large Diameter and Very Long Bored Piles[J];Bridge Construction;2010-S1
7 LI Shu-bao,ZHAO Kun-peng(The 5th Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group,Jiujiang 332001,China);Construction Techniques for Large Diameter and Very Long Bored Piles in Spheroidal Weathering Granite Layer in Sea[J];Bridge Construction;2011-03
8 Zeng Jing;Discussion on Underwater Concrete Irrigate Stakes Construction Technique and Quality Control——Talk about a Bridge Stake Basement[J];Chinese and Overseas Architecture;2011-08
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved