Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2014-02
Add to Favorite Get Latest Update

The construction technology of ripping into the main hole of south central channel Fajiushan tunnel No. 4 inclined shaft

JIANG Hua;China Iron One Bureau Group Fifth Engineering Co.,Ltd;  
Combining with the engineering example,this paper introduced the construction technology of tunnel inclined shaft ripping and joist frame door coordination of door beam drift method into the main hole,the cross section main hole at one excavation,support timely,construction safety,quality guaranteed,provided technical support and reference for other inclined shaft entering the main hole construction.
【CateGory Index】: U455.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 WU Rui(Two Company,China Railway Twelve Bureau Group,Taiyuan 030032,China);The construction technology of tunnel auxiliary shaft hole[J];Shanxi Architecture;2013-05
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 Li Ben(Zheng-Xi PDL Co.Ltd.,Xi'an 710043,China);Ripping Construction for Oblique Well of Large Section Loess Tunnel Leading to Positive Curve[J];Railway Construction Technology;2008-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved