Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2017-02
Add to Favorite Get Latest Update

Study on GPR in subway tunnel geological forecast

Fan Jiajun;China Railway 3rd Survey & Design Institute Group Co.,Ltd;  
Starting from aspects of wave speed determination,antenna center frequency,time window length and sampling interval,the thesis introduces geological radar detecting principles,and describes its specific application in subway tunnel advanced geology forecast,which has provided some guidance for subway tunnel advanced geology forecast.
【CateGory Index】: U452.11;U231.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 Liu Wei;Ye Wen;China Railway 14th Bureau Group Co.,Ltd;Engineering College,Sun Yat-sen University;;On application of geological radar in subway train depot integrated project tunnel[J];山西建筑;2017-28
2 DAI Weida;Beijing MTR Construction Administration Corporation;;Influence of Undercrossing Construction of Metro Interval Tunnel with Mining Method on Bridge Group and Its Construction Control[J];铁道建筑;2017-09
【Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHANG Mingchen;WEI Sui;JIANG Binsong;FAN Jincheng;State Key Laboratory for Geomechanics & Deep Underground Engineering,CUMT;CCCC Second Highway Consultants Co., Ltd.;Yankuang Group Co., Ltd.;;On the Application of Ground Penetrating Radar for Quality Detection of Tunnel Linings in Cold Regions[J];现代隧道技术;2016-01
【Co-citations】
Chinese Journal Full-text Database 3 Hits
1 Li Qi;;Research on Ground Penetrating Radar Based on Underground Pipeline Detection[J];建筑技术开发;2017-14
2 XU Yue;YU Shijian;ZHANG Yadong;College of Mining and Safety Engineering,Shandong University of Science and Technology;;Detection and Recognition of Support Structure Diseases of Metro Tunnel Constructed by Mining Method Based on Forward Modeling[J];隧道建设;2017-02
3 Fan Jiajun;China Railway 3rd Survey & Design Institute Group Co.,Ltd;;Study on GPR in subway tunnel geological forecast[J];山西建筑;2017-02
【Co-references】
Chinese Journal Full-text Database 8 Hits
1 Fan Jiajun;China Railway 3rd Survey & Design Institute Group Co.,Ltd;;Study on GPR in subway tunnel geological forecast[J];山西建筑;2017-02
2 LI Shucai;LIU Bin;SUN Huaifeng;NIE Lichao;ZHONG Shihang;SU Maoxin;LI Xiu;XU Zhenhao;Research Center of Geotechnical and Structural Engineering,Shandong University;College of Geology Engineering and Geomatics,Chang′an University;;STATE OF ART AND TRENDS OF ADVANCED GEOLOGICAL PREDICTION IN TUNNEL CONSTRUCTION[J];岩石力学与工程学报;2014-06
3 Jin Bao(Ji’nan Urban Construction Co.,Ltd.,Ji’nan,Shandong 250033,China);Application of Sleeve Valve Pipe Grouting Technology in Bridge Pier Reinforcement of Guangzhou Metro Project[J];施工技术;2010-11
4 WANG Jinshan1,2,WANG Li2,CAO Zhigang2,LIU Zhigang3,WANG Liang4,ZHU Hui5 (1. State Key Laboratory of High-efficient Mining and Safety of Metal Mines(University of Science and Technology Beijing),Ministry of Education,Beijing 100083,China;2. Hebei Normal University of Science and Technology,Qinhuangdao,Hebei 066004, China;3. Shijiazhuang Railway Institute,Shijiazhuang,Hebei 050043,China;4. Yanshan University,Qinhuangdao, Hebei 066004,China;5. Site Headquarters of Xiamen Subsea Tunnel,China Railway 22nd Bureau Group Co.,Ltd.,Xiamen, Fujian 361009,China);PRACTICE ON SYNTHETIC GEOLOGICAL PREDICTION AHEAD OF CONSTRUCTION OF XIAMEN SUBSEA TUNNEL[J];岩石力学与工程学报;2007-11
5 Lu Tian1,Li Qianguo2;Application of Geological Advance Forecast in Kuigang Tunnel Construction[J];公路交通技术;2007-04
6 CHEN Rongtai (Guangzhou Metro Corporation,Guangzhou 510380);Advanced Technical Method Geological Forecast for the Construction of Shallowly Buried and Undermined Tunnel for Metro Building[J];广州建筑;2007-01
7 MENG Xiao-lian~1,CHEN Yong-shu~2,SHI Zhong-heng~1(1.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China;2.The 13th Bureau of the China Railway,Changchun 130031,China);Construction techniques of tunnels in soft silt sandy clay[J];铁道科学与工程学报;2006-04
8 Liu Zhiwei,Liao HongyanDesign Institute of Guangzhou Metro Corporation,510010,Guangzhou,China;Research about the Optimum of Metro Construction Design[J];城市轨道交通研究;2006-07
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 WANG Xue-yan;JIA Rui-chen;Hunan high speed railway Career Technical College;;Risk Assessment and Control Measures Analysis of Mine Tunnel Engineering[J];世界有色金属;2018-15
2 YANG Fen;Jiangsu xinglin carbon corp. LTD.;;Analysis of energy-saving measures in mining engineering buildings[J];世界有色金属;2018-05
【Secondary Citations】
Chinese Journal Full-text Database 9 Hits
1 Han Haodong;Ding Jianfang;Guo Rujun;China Railway Southwest Research Institute Co. Ltd.;;Numerical Simulation of Geological Radar Detection for Unfavorable Geologic Bodies at the Tunnel Floor[J];现代隧道技术;2014-01
2 Ling Yao Li Tianbin,Meng Lubo Zeng Zhifa(1 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology,Chengdu,Sichuan 610059,China;2 China Merchants Chongqing Communications Research & Design Institute Co.,Ltd,Chongqing);Research on the Influence of Faults on the Collapse of the YangJiashan Tunnel After the Wenchuan Earthquake and GPR Detection[J];现代隧道技术;2011-06
3 GUO Liang1,LI Juncai1,ZHANG Zhicheng2,CHENG Shoujin2(1.College of Civil Engineering,Nanjing University of Technology,Nanjing,Jiangsu 210009,China; 2.Nanjing Nanda Geotechnical Engineering Technology Co.Ltd.,Nanjing,Jiangsu 210008,China);RESEARCH ON SURROUNDING ROCK LOOSE ZONE OF TUNNEL UNDER UNSYMMETRICAL LOADING WITH GROUND PENETRATING RADAR AND ITS APPLICATION[J];岩石力学与工程学报;2011-S1
4 YU Jun,LIU Song-yu,TONG Li-yuan(Institute of Geotechnical Engineering School of Transportation,Southeast University,Nanjing 210096,China);Research on application of GPR to quality detection of first lining of tunnel[J];岩土力学;2008-S1
5 LI Er-bing,TAN Yue-hu,DUAN Jian-li(Engineering Institute of Engineering Corps,PLA Univ.of Sci.& Tech.,Nanjing 210007,China);Application of Ground Probing Radar in Tunnel Engineering Detection[J];地下空间与工程学报;2006-02
6 LI Jin-ping,SHAO Pi-yan,GU Mu(Railway Engineering Research Institute,China academy of Railway Sciences,Beijing 100081,China);Application and Analysis of GPR in Railway Tunnel Engineering Quality Inspection[J];中国铁道科学;2006-02
7 Yan Changbin Xu Guoyuan Huang Rendong (Resource and Safety Engineering Institute of Zhongnan University, Changsha 410083);Application of ground penetrating radar to quality identification of tunnel works[J];现代隧道技术;2003-06
8 Cao Huo (Zhejiang Provincial project Quality Supervision Station, Hangzhou 310009) Zheng Jiandong Xiao Lijun (Zhejiang Provincial Hengli Traffic Engineering Co. , Ltd. , Ningbo 315040) Mao Yunlong (Hangzhou Traffic Engineering Quality Supenision Division, Hangzhou 310007);Radar inspection on contact condition between lining and surrounding rock[J];现代隧道技术;2002-05
9 LIU Dun wen,HUANG Ren dong,XU Guo yuan,LU Miao rong (College of Resource, Environment and Civil Engineering, Central South University, Changsha 410083, China);THE APPLICATION OF GROUND-PENETRATING RADAR TO THE INSPECTION OF TUNNEL LINING QUALITY[J];物探与化探;2001-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved