Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2017-08
Add to Favorite Get Latest Update

The application and implementation key points of high formwork support system of fastener type steel pipe frame

Li Mingwu;Hanzhong Construction Engineering Corporation;  
Combining with the engineering example,from the foundation treatment,full scaffold erection,shear bracing setting,concrete pouring,template removal five aspects,this paper elaborated the construction key points of high formwork support system of fastener type steel pipe frame,and put forward the installation quality control standards and measures of high formwork support,ensured the safety and effectiveness of the system.
【CateGory Index】: TU755.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved