Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2017-08
Add to Favorite Get Latest Update

Research on heating insulation and temperature control technology of continuous beam in winter construction

Wang Wenmin;Fifth Engineering Limited Company,China Railway 12th Bureau Group;  
Taking the winter construction of Zouzi super bridge cross Qingzi road 100 m continuous beams of Ji-Qing high-speed railway,from the thermal insulation erection,steam generator installation,HC-TW80 wireless temperature measurement instrument installation and other aspects,elaborated the heating insulation measures of continuous beam winter construction,adjusted the beam curing temperature and other process means,both ensured the construction quality and speed up the construction progress.
【CateGory Index】: U445.43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved