Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Science & Technology Vision》 2016-26
Add to Favorite Get Latest Update

Design of Power Supply,Distribution and lightning Protection For Radar Test Room

XIA Yong;JIANG Jian-qian;XIA Tian;East China Research Institute of Electronic Engineering;ECU Electronics Industrial Co.,LTD;  
The main task of ATE is to repair the electronic equipments of radar,which can not be repaired in radar position.And the ATE is equipped in radar test room.By means of optimization design of power supply,distribution, lightning protection and grounding for radar test room,the mission of test and maintenance for radar is reliably guaranteed.
【CateGory Index】: TU895;TN957
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved