Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Air Force Radar Academy》 2008-01
Add to Favorite Get Latest Update

An Algorithm of Task Scheduling Based on the Grid for Communication Cost

ZHANG Li-quan1,YANG Rui-juan2,XIAO Yu-fen2(1.Department of Graduate Management,AFRA,Wuhan 430019,China;2.Department of Information & Command Automation,AFRA,Wuhan 430019,China)  
Aimed at the instability of communication cost that exists in the communication-denseness task scheduling in grid,an algorithm of task scheduling cost was proposed in terms of communication costa,dopting the strategy of dynamic scheduling in a grid isomorphic computing circumstance,on the basis of the min-min algorithm.The experimentation results show that the algorithm is effective in the communication-denseness task scheduling.
【CateGory Index】: TN915.01
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Zu-zhu~(1,2), CHENG Jia-xing~1 ing & Signal Processing, Anhui University,Hefei230039,China;2.Management School,Anhui University,Hefei230039,China);An algorithm on solving combinatorial optimization problems——branch-and-bound method[J];Journal of Anhui University(Natural Sciences);2004-01
2 LIANG Jianyong1,2,FU Yongping2(1.School of Electronic and Information Engineering,Lanzhou Jiaotong University,Lanzhou 730070,Gansu,China; 2.School of Electronic and Information Engineering,Ankang University,Ankang 725000,Shaanxi,China);QoS Guided Selection Approach for Grid Resource[J];Journal of Ankang University;2012-01
3 Luo Ya-li Shi Hong-chun (Chande Vocational Technical College Electronic Information Department Changde 415000);A Support Grid Reputation Management Mechanism[J];Information Security and Technology;2011-Z1
4 LU Li shun et al;Neural Network Based Prediction of Correlation between Pile Deformation and Its Nearby Foundation Pit[J];Underground Space;2003-04
5 XU Cheng-ge1, LI Xia2(1.Graduate School of Shenzhen University, Shenzhen 518060,China;2.College of Information Engineering, Shenzhen University, Shenzhen 518060,China);Hybrid searching strategy for the optimal spare allocation in VLSI systems[J];Semiconductor Technology;2003-12
6 GUO Yong-hui(Dep of Indu Eng,Zhengzhou Inst of Aeron Indu Manag,Zhengzhou 450015,China);Study on Production Optimization in Wafer Fabrication Based on Drum-Buffer-Rope Theory[J];Semiconductor Technology;2007-10
7 Xu Ruqing1,2,Dong Gang1,Huang Weiwei1,and Yang Yintang1(1 Key Laboratory of the Ministry of Education for Wide Band-Gap Semiconductor Materials and Devices,Microelectronics Institute,Xidian University,Xi'an 710071,China)(2 Department of Advanced Research,CETC,Beijing 100846,China);A Second Single-Probe Traversal Optimization for MCM Substrate[J];Chinese Journal of Semiconductors;2007-10
8 Hou Dong Pan Lin Hu Yongbo (College of Information Eng., North China Univ. of Tech., 100041, Beijing, China);Optimal Design of Linear Light Source of Headlights[J];Journal of North China University of Technology;2004-01
9 LIU Wei_guo, HU Si_ji (College of Traffic and Transport, Northern Jiaotong University, Beijing 100044,China);Chance Constrained Programming Model with Fuzzy Parameters for Passenger Traffic Mode Choice Behavior[J];Journal of Northern Jiaotong University;2002-02
10 DING Ding,LUO Si-wei,GAO Zhan(School of Computer and Information Technology,Beijing Jiaotong University, Beijing 100044,China);Heuristic Grid Scheduling Strategy Based on Task Partition[J];Journal of Beijing Jiaotong University;2007-05
China Proceedings of conference Full-text Database 10 Hits
1 Zhang, Lei, Liu, Chen, Yang, ZhengQiu (School, of, Computer, Science, and, Technology, Beijing, University, of, Posts, and, Telecommunications, 100876);Research, on, Fusion, of, Grid, Technology, and, NGN[A];[C];2006
2 Quanmin Wang, Liang Wang, Zhihong Xu (College of Computer Science, Beijing University of Technology 100022) (College of Electronic and Information Engineering,Tianjin University 300072);Study of Ant Algorithm-Based Batch Job Scheduling in Grid Computing[A];[C];2006
3 Qi-yi Zhang Zhi Zhang Dong Mei Transportation Command Department of Automobile Management Institute,Bengbu,Anhui,233011;Application of Combination of Genetic Algorithm and Neural Network to the Forecast of Material Transportation Quantity on the Road[A];[C];2010
4 Liu Changshi School of Management, Hunan University of Commerce, P.R.China, 410205;improved tabu search for vehicle routing problem with time windows[A];[C];2009
5 Li Da-jun, Cheng Peng-gen,Liu Bo (1.Geosciences and Geomatics University of East China Institute of Technology, Fuzhou 344000, China);Study on RBF network model used for GPS height conversion[A];[C];2007
6 Luo Wencai, Chen Xiaoqian (College of Aerospace and Material Engineering National University of Defense Technology, Changsha 410073);Parallel Computation Multimethod Collaborative Optimization Algorithm[A];[C];2005
7 YAN Tong, LI Wei, LI Yun-chun (School of Computer Science and Engineering, BeiHang University, Beijing 100083);QoS Guided Task Scheduling Heuristic in Computational Grid Environments[A];[C];2006
8 YIN Feng, LI Zhi-shu, WU Shou-xian, WANG Li, ZHANG Shang-you (School of Computer Science and Technology, Southwest University for Nationalities, Chengdu 610041, China) (School of Computer, Sichuan University, Chengdu 610065, China);A Dynamic Region's Grid Resource Management Model Based on QoS[A];[C];2006
9 QIN Jin Wu Qiong School of Traffic and Transportation Engineering, CentralSouth University, Changsha 410075;Improved Simulated Annealing Algorithm for Logistics Network Design Problem[A];[C];2006
10 Zhou Wei,Bu Yanping;Application of Improved Genetic Algorithm to Grid Task Scheduling[A];[C];2010
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved