Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《COAL MINE MACHINERY》 2000-01
Add to Favorite Get Latest Update

Use and improvement of mining underground breaker

WEI Xiao ling;HU Jin sheng (1.Hebei Institute of Architectural Science & Technology,Handan 056038,China; 2.Xingtai Mine of Xingtai Mining Group,Xingtai 054026,China)  
Point at the problems existing in the operation procedure of underground breakers,this paper presents some detailed measures about improving breakers
【CateGory Index】: TD451
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 LIU Jian-shou, ZHAO Hong-xia(Luoyang College of Technology, Luoyang 471003,China);Design and Application on the Unloading Construction in the Pulling Force at the Main Shaft Side of Vertical Shaft Hammer Crusher[J];Coal Mine Machinery;2005-08
【Citations】
Chinese Journal Full-text Database 1 Hits
1 ;Defaults analysis and modification of the JC4060 jaw crusher[J];MINING & PROCESSING EQUIPMENT;1998-10
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved