Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Coal Science and Technology》 2001-06
Add to Favorite Get Latest Update

Test and research on triple row tube high pressure jet grouting to build water penetration proof wall

LI Guo-qiang 1, ZHAO Jian-hui 2 (1 Beijing China Coal Mine Engineering Co. Ltd., Beijing 100013, China; 2 Harbin Foundation Engineering Company, Harbin 150000, China)  
Taking a trial of triple row tube high pressure jet grouting to build a underground water penetration proof wall in a project as an example, the paper introduced a basic principle, construction equipment and technology of the triple row high pressure jet grouting and the technical parameters and physical mechanical performances of the water penetration proof wall.
【CateGory Index】: TV543.8
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved