Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Coal Science and Technology》 2011-01
Add to Favorite Get Latest Update

Drilling-Grouting Simultaneous Operation Technology in Mine Shaft Construction

ZUO Yong-jiang1,ZHOU Xing-wang2,HONG Bo-qian1(1.State Engineering Lab of Deep Mine Construction Technology,Beijing China Coal Mine Construction Engineering Company Ltd., Beijing 100013,China;2.Tiandi Science and Technology Company Ltd.,Beijing 100013,China)  
To build a large modernized mine would have a mine shaft development mode.A mine shaft drilling method would be applied to the alluvium section of the mine shaft and the surface pre-grouting method would be applied to the base rock section of the mine shaft.According to the long time problems of the traditional construction sequences,with the study on "the study and demo project of the key technology for the drilling and grouting simultaneous operation" in the 11th Five Years National Science and Technology Support Program,the design principle of the time and space relationship between the drilling and grouting was set up and the high accuracy inclinometer while drilling,the monitoring and measuring of the drilling mud affected by the grouting liquid and other key technology were solved.It was first at home and abroad that the grouting method and mine shaft drilling method were conducted with a simultaneous operation at the certain time and space.The mine shaft construction period could be reduced by 20%~30%.The paper in detail stated the features of the drilling and grouting simultaneous operation,the implementation mode,design principle and support technology.
【Fund】: “十一五”国家科技支撑计划资助项目(2008BAB33B05)
【CateGory Index】: TD265.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 CHEN Zhen-guo1,2,WANG Zhi-xiao1,2,SONG Xue-fei1,2(1.Research Institute of Mine Construction,Tiandi Science and Technology Company Ltd.,Beijing 100013,China; 2.Beijing China Coal Mine Engineering Company Ltd.,Beijing 100013,China);Study on Construction Technology of Surface Ground Pre-Grouting for Mine Shafts in Northwest China Mining Area[J];Coal Science and Technology;2013-02
【Citations】
Chinese Journal Full-text Database 4 Hits
1 SHI Ji-sheng(China Coal Special Drilling Engineering(GROUP) Corporation Limited,huaibei Anhui 235044);The development of China's coal mine shaft drilling rig[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2010-02
2 HONG Bo-qian(China Coal Research Institute,Beijing 100013,China);Comprehensive technology for deep mine rapid construction[J];Coal Science and Technology;2006-01
3 ZHOU Xing-wang(Research Institute of Mine Construction,China Coal Research Institute,Beijing 100013,China);Development and outlook of mine shaft special sinking technology in China[J];Coal Science and Technology;2007-10
4 SUN Jian-rong(Beijing China Cola Mine Construction Engineering Co.,Ltd.,Beijing 100013,China);Experiment research about grouting liquid influences the slurry in the drilling and grouting method parallel operations[J];China Mining Magazine;2010-10
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Hua 1,2,Cheng Hua 1,Ji Hongguang 2,Yao Zhishu 3,Rong Chuanxin3(1.School of Civil Engineering,Anhui Institute of Architecture and Industry,Hefei 230022,China;2.Civil & Environment Engineering School,University of Science and Technology Beijing,Beijing 100083,China;3.Research Station of Underground Structural Engineering,Anhui University of Science and Technology,Huainan 232001,China);Experimental study on electrical conducting characteristics of silty soil in Shanghai under artificial freezing[J];Geotechnical Investigation & Surveying;2010-06
2 Zhang Hongtao1 Zhao Yufei 2 Ji Hongguang3(1.Department of Civil Engineering,Beijing University of Technology,Beijing 100144,China;2.China Institute of Water Resources and Hydropower Research,Beijing 100044,China;3.Department of Civil Engineering,University of Science and Technology Beijing,Beijing 100083,China);RELIABILITY ANALYSIS OF PILOT HOLE DRILLING FOR DEEP VERTICAL AND INVERSE WELL[J];Industrial Construction;2011-S1
3 LIU Shao-wei,ZHANG Wei-guang,GAN Yuan-yuan,DONG Shi-ju(School of Energy Science and Engineering,Henan Polytechnic University,Jiaozuo 454000,Henan,China);The destruction migration features and controlling of floor rock in the deep mining roadway[J];Journal of Henan Polytechnic University(Natural Science);2012-01
4 ZHOU Chang-shan ZHANG Peng;Research status and prospect of freezing sinking shaft technique in deep and thick alluvium[J];Shanxi Architecture;2010-22
5 YIN Zong-yu(Liuzhuang Coal Mine,SDIC Xinji Energy Group Co.,Ltd,Huainan 232001,China);Deep mine soft rock roadway floor heave strengthening governance technology research in Liuzhuang mine[J];Shanxi Architecture;2012-17
6 SONG Lei,YANG Wei-hao,LI Hai-peng(State Key Laboratory for Geomechanics & Deep Underground Engineering,School of Architecture & Civil Engineering,China University of Mining & Technology,Xuzhou,Jiangsu 221008,China);Monitoring of Freezing Shaft Sinking in Ultra-Deep Alluvium of Guotun Coal Mine[J];Journal of Mining & Safety Engineering;2010-01
7 HAN Tao1,YANG Wei-hao1,2,REN Yan-long2,YANG Zhi-jiang1,2(1.State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining& Technology,Xuzhou,Jiangsu 221008,China;2.School of Mechanics and Civil Engineering,China University of Mining & Technology,Xuzhou,Jiangsu 221116,China);Horizontal Ultimate Bearing Capacity of Encased Steel Concrete Shaft Lining[J];Journal of Mining & Safety Engineering;2011-02
8 JU Feng,ZHANG Ji-xiong,AN Bai-fu (School of Mines,State Key Laboratory of Coal Resources and Safe Mining,China University of Mining & Technology,Xuzhou,Jiangsu 221116,China);Key Construction Technology of Vertical Feeding Bore Hole for Solid Materials in Backfilling Coal Mining[J];Journal of Mining & Safety Engineering;2012-01
9 LI Shao-qing1,ZHANG Ke-ren1,RONG Chuan-xin2,CHENG Hua2(1.Anhui Institute of Architecture Industry,Hefei 230601,China;2.Anhui University of Science and Technology,Huainan 232007,China);Mud Flow Analysis and Structure Optimization for Shaft Drilling Machine[J];Coal Mine Machinery;2012-04
10 WU Shi-jie,WANG Xin,WANG Qiang,SUN Jian-rong(Bejing Zhongmei Mine Engineering Co.,Ltd,Beijing 100013,China);Development of Double-metal Wedge Hob with Wear and High-pressure Resistant Quality[J];Coal Mining Technology;2011-02
China Proceedings of conference Full-text Database 5 Hits
1 Hong Boqian (China Coal Research Institute, Beijing 100013);Special Shaft Sinking and Vertical Additional Force in the Profundity Alluvium[A];[C];2006
2 Tang Yongzhi (Huainan Coal Mining Group Corporation Ltd Anhui Huainan 232001);Key technology of Deep and large mine shaft construction in Huainan mining area[A];[C];2009
3 Cai Haibing Rong Chuanxin Cheng Hua Yao Zhishu (Department of Civil Engineering of Anhui University of Science and Technology Anhui Huainan 232001);Study on mechanical characteristic of twolayer steel plate and concrete shaft lining under non uniform pressure[A];[C];2009
4 Chen Wei Tong Hongchang Zhou Jinsheng (Pingdingshan Coal Mining Construction Group Co.Ltd Henan Pingdingshan 467000);The Key Technical Problems of Freezing Sinking in Thick Surface Soils of China[A];[C];2009
5 CAO Jun,SHEN Zhi-kang,HU Yong-le,FAN Cheng-zhou,WANG Ding-xian,DE Li-rong,YANG Huan (Northwest Institute of Nuclear Technology,Xi'an 710024,China);Theoretic analysis of specific power of broken hard rock by impact action and its fuzzy prediction model[A];[C];2012
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 MA Yong & GAO Yan-long (Yan'an University,Yan'an 716000,China);Efficiency of the Application of Sci-tech Resources[J];Journal of Northeast Normal University;2002-03
2 LU Xi-ying(Yunnan University of Finance and Economics,Kunming 650221,China);China Science and Technology Input-Output Quadratic Performance Evaluation Based on DEA[J];Journal of Guangxi University of Finance and Economics;2009-03
3 CHEN Hong-yan Zhang Shuang(Business School of Hohai University,Nanjing 210098 China);AN Empirical Study of S-tech Efficiency of large-medium-sized Industry Enterprise Based on Analysis of DEA[J];Industrial Engineering and Management;2007-02
4 He Qingfeng1,2,Chen Wu1,Wang Xuejun1(1.Economics & Management School,Wuhan University,Wuhan 430072,China;2.State-owned Assets Supervision and Administration Commission of Hubei Provincial People's Government,Wuhan 430071,China);Relationships among Direct Human Capital Input,R&D Input and Innovation Performance:An Empirical Study Based on Panel Data about S&T Activities in China[J];Technology Economics;2009-04
5 HU Kun1,ZHOU Guo-qing1,JING Liu-jie2,WANG Jian-zhou1,ZHOU Jie1,WEI Ya-zhi1(1.State Key Laboratory for Geomechanics & Deep Underground Engineering,China University of Mining & Technology,Xuzhou,Jiangsu 221008,China;2.Beijing SANY Heavy Machinery Limited Company,Beijing 102206,China);Experimental Research on Multi-Circle Freezing Temperature Field for Thick Top Soil[J];Journal of Mining & Safety Engineering;2010-02
6 SHEN Bao-hong,LEI Yi (China Coal Technology & Engineering Group Corp,Beijing 100013,China);Chinese Coal Technology Development Status and Tendency[J];Coal Mining Technology;2011-03
7 SONG Yu1,WANG Ming-jie2,WANG Chun-mei1(1.Economics and Management Department,Heilongjiang Institute of Science and Technology,Harbin 150027,China;2.Harbin Institute of Coal Machine,Harbin 150036,China);Distribution of Scientific and Technological Resources of Coal Industry Inchina[J];Coal Technology;2009-10
8 XU Zhuo-lin~ (1), WANG Feng~ (1), XU Run~ (2) (1. Guotou Xinjie Energy Company Ltd., Huainan 232171, China; 2. China Coal Research Institute, Beijing 100013, China);Grouting-freezing-shaft sinking simultaneous operation technology[J];Coal Science and Technology;2004-02
9 HONG Bo-qian(China Coal Research Institute,Beijing 100013,China);Comprehensive technology for deep mine rapid construction[J];Coal Science and Technology;2006-01
10 ZHOU Xing-wang(Research Institute of Mine Construction,China Coal Research Institute,Beijing 100013,China);Development and outlook of mine shaft special sinking technology in China[J];Coal Science and Technology;2007-10
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ;Design and installation of sidewall of 600m-deep-well in Longgu mine[J];China Coal;2004-06
China Proceedings of conference Full-text Database 1 Hits
1 Li Lianhua, Wang Ranfang (Xinlu Freezing and Installation Company of Yanzhou Mining Group, Zoucheng, Shandong 273500);Construction of the Auxiliary Shaft of Longgu Colliery in Thick Overburden by Freezing Method[A];[C];2005
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved