Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Ocean University of Qingdao》 2004-01
Add to Favorite Get Latest Update

Application of the Analytic Hierarchy Process to Project Risk Management

DING Xiang-qian1, SHI Shuo2 (Ocean University of China, 1. Information Engineering Center, 2. Department of Computer Science, Qingdao 266071, China)  
The theory and algorithm of the analytic hierarchy process are introduced in detail. In accordance with the characteristics of modern project risk management that it deals with a wide range of problems and involves sophisticated techniques, an effective method is proposed for the comparison and selection of the indexes and schemes that appear in project rish assessment. An example is presented to show the usage of the method and its significance in improving project management.
【CateGory Index】: F062.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 7 Hits
1 Chi Zhou; Zhang Jun (Anhui Institute of Transportation Science,Hefei 230011,China);Application of AHP in Quality Risk Management of Highway Engeneering[J];Value Engineering;2007-02
2 ZHANG Hui,YANG Jian-bin(Department of Management& Science,Weinan Teachers University,Shanxi Weinan 714000 PRC);Study on the Early Warning Project Risk Model of FAHP[J];Jiangxi Science;2009-05
3 CHEN Jian-jun,et al(Business School of Hohai University,Nanjing 210098,China);Application of analytic hierarchy process in risk assessment of water conservancy projects[J];Journal of Economics of Water Resources;2007-01
4 ZENG Feng,LI Xia-miao(The School of Traffic and Transportation Engineering,CSU,Changsha 410075,China );Reliability Analysis of Supply Chain Based on AHP[J];Logistics Technology;2005-10
5 LIU Li-hua(Department of Information and Management Engineering, Xi'an University of Post and Telecommunications,Xi'an 710061,China);An application of AHP in credit administration of mobile communication enterprises[J];Journal of Xi'an University of Post and Telecommunications;2007-02
6 MAO Xu-chuan, TIAN Bing-quan, HUANG Qi (School of Management, West china University, Chengdou 610039, P. R. C. );Application of the analytic hierarchy process to electric Construction project risk evaluation[J];Journal of Southwest University for Nationalities(Natural Science Edition);2007-03
7 Ju Tao Chen Bowen Sun Limin(The Academy of Military Transportation,Tianjing 300161,China);The Fuzzy Analytic Network Process[J];Science & Technology Information;2010-02
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Hong Zhiguo 1 Li Yan 2 Fan Zhihua 1 Wang Yong 11 (GSL Lab.,Software Institute,Chinese Academy of Sciences,Beijing100080)2 (Computer Dep.,USTC,Hefei230027);Caculation on High-ranked R I of Analytic Hierarchy Process[J];Computer Engineering and Applications;2002-12
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 ZHAO Bao-li et al(Faculty of Urban Construction and Environmental Engineering,Chongqing University,Chongqing 400045);Impact Determination on the Various Indicators of the Losses Caused by Water Pollution Accidents[J];Journal of Anhui Agricultural Sciences;2009-06
2 Song Hongguang1,Yang Sanming2,Wu Biao2(1.Faculty of Urban Consruction and Environmental Engineering,Chongqing University,Chongqing 400044,China;2.Chongqing Academy of Environment Science,Chongqing 401147,China);AHP for Choice of Enterprises before Locating in Industrial Zones[J];Environmental Science and Management;2009-06
3 LIU Binsheng1 WANG Xueqing1 LI Jinhai2(1.Tianjing University,Tianjin,China;2.Hebei University of Technology, Tianjin,China);Evaluating Projects under the Direction of W-S-R Methodology[J];Chinese Journal of Management;2007-04
4 WANG Wen-xiong1,2,LI Qi-ming1(1.The Research Institute of Construction Management and Real Estate,Southeast University,Nanjing,210096 P.R.China;2.School of Land Management,Huazhong Agricultural University,Wuhan,Hubei,430070,P.R.China);Early Warning of Risk for Transportation Infrastructure Projects under a PPP Model[J];Journal of Chongqing Jianzhu University;2008-05
5 Chen Cheng,Xue Hengxin,Zhang Qingmin(School of Economics & Management,Nanjing University of Science & Technology,Nanjing 210094,China);Redundancy Design on Supply Chain and Analysis on Importance Degree of Member Based on Reliability[J];Technology Economics;2009-03
6 LI Sheng-ze1,JIANG Rong-hua1,2(School of Management,Guilin Institute of Technology,Guilin 541004;2.School of Public Management,Huazhong University of Science and Technology,Wuhan 430063,China);Research on the Implementation of KPI Weight Assignment Based on AHP Using Delphi[J];Computer Engineering & Science;2008-02
7 Wang Xu;Cao Daqiang;Xing Lebin (School of Mechanical Engineering,Chongqing University,Chongqing 400044,China);To Study on Risk Control of the Construction Project Based on Information Entropy[J];Value Engineering;2008-06
8 Yi Xin (School of Civil Engineering and Architecture,East China Jiaotong University,Nanchang 330013,China);To Study on Decision-Making of Project Bidding under BQ Mode[J];Value Engineering;2008-11
9 ZHOU Qing ZHAN Hui;On the transport organization during the expansion of the overpasses of Guang-Fo freeway[J];Shanxi Architecture;2008-26
10 QIAO Zhen-jiang;The Application of Analytic Hierarchy Process(AHP) in Risk Management of Communication Guarantee[J];Sci-Tech Information Development & Economy;2009-09
China Proceedings of conference Full-text Database 1 Hits
1 CHEN Zhi-song CHEN Jun-fei (State Key Laboratory of Hydrology Water Resource and Hydraulic Engineering and Management Science Institute, Business School, Hohai University, Nanjing 210098, China);Research on the Reliability of Supply Chain System Based on Customer Queuing Complying with M/M/s/N/∞[A];[C];2008
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved