Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Qufu Normal University(Natural Science)》 1988-03
Add to Favorite Get Latest Update

A Delay Problem: The Lmprovement on Emmons Conditions and the Prearrangement About Work Pieces

Lin Tao Guochun Tang(Shanghai Second Polytechnic University)  
In. the Present Paper, The improved Emmons Conditions abont the tardiness Problem are established and the Presequencing algorithm is proposed.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 ZHANG Shu-xia TANG Guo-chun (1.Department of Mathematics,East China Normal University,Shanghai 200062,China; 2.Department of Watercraft Command,Zhenjiang Watercraft College,Zhenjiang 212003,China; 3.Institute of Management Engineering,Shanghai Second Polytechnic University,Shanghai 201209,China);Approximation Algorithm for the Total Tardiness Scheduling with Precedence Constraints[J];Journal of East China Normal University(Natural Science);2007-01
2 ZHANG Shu-xia~(①②),TANG Guo-chun~③,ZHANG Yu-zhong~④(① Department of Mathematics,East China Normal University,200062,Shanghai;② Department of Watercraft Command,Zhenjiang Watercraft College,212003,Zhenjiang,Jiangsu;③ Institute of Management Engineering,Shanghai Second Polytechnic University,200062,Shanghai;④ College of Operations Research and Management Science,Qufu Normal University,276826,Rizhao,Shandong,PRC);On the Improved Emmons Conditions for the Total Tardiness Scheduling[J];Journal of Qufu Normal University(Natural Science);2006-02
3 Tang Guochun (Department of Manegement);Sequencing to Minimize the Weighted Number of Tardy Jobs[J];Journal of Shanghai Second Polytechnic University;1990-01
4 LIANG Tian-juan~1 LU Jia~1 TANG Guo-chun~2 (1.College of Mathematics and Computer Science,Chongqing Normal University,Chongqing 400047,P.R.China;2.Institute of Management Engineering,Shanghai Second Polytechnic University,Shanghai 200041,P.R.China);Multi-criteria Constrained Scheduling Problems with Lateness or Tardiness as the First Criterion[J];Journal of Shanghai Second Polytechnic University;2007-03
【Co-citations】
Chinese Journal Full-text Database 5 Hits
1 DOU Wen-qing,SUN Liang (School of Science,Shanghai Second Polytechnical University,Shanghai 201209,P.R.China);The Pre-sequencing of Jobs for Single Machine Scheduling Problem[J];Science Technology and Engineering;2012-02
2 HAN Ji-ye(Institute of Applied Mathematics, Academia Sinica)XU Ben-shun(Qufu Normal University);ADVANCES IN THE THEORY OF SEQUENCING AND SCHEDULING[J];Journal of Qufu Normal University(Natural Science);1987-02
3 Tang Guochun (Department of Managment);The Analysis of Some Algorithms for the One-Machine Tardiness Problem[J];Journal of Shanghai Second Polytechnic University;1987-02
4 Chen Minchao He Rong (DePartement of Computer Science) Tang Guochun (Departement of Management);An Algoritnm of Pre-sequencing Jobs and its Feasibility[J];Journal of Shanghai Second Polytechnic University;1988-02
5 Tang Guochun (Department of Manegement);Sequencing to Minimize the Weighted Number of Tardy Jobs[J];Journal of Shanghai Second Polytechnic University;1990-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 HAN Ji-ye(Institute of Applied Mathematics, Academia Sinica)XU Ben-shun(Qufu Normal University);ADVANCES IN THE THEORY OF SEQUENCING AND SCHEDULING[J];Journal of Qufu Normal University(Natural Science);1987-02
2 Chang Shi-wei (Department of Statistics and Operation Research, Fu Dan University, Shanghai, China);The Analysis of the Backward Shift Method for the one-Machine Tardiness Problem[J];Journal of Qufu Normal University(Natural Science);1988-03
3 ZHANG Yu-zhong,MIAO Cui-xia(Institute of Operation Research,Qufu Normal University,276826,Rizhao, Shandong,PRC);COPY METHOD AND ITS APPLICATIONS ON THE BATCHING SCHEDULING PROBLEMS[J];Journal of Qufu Normal University(Natural Science);2004-02
4 ZHANG Shu-xia~(①②),TANG Guo-chun~③,ZHANG Yu-zhong~④(① Department of Mathematics,East China Normal University,200062,Shanghai;② Department of Watercraft Command,Zhenjiang Watercraft College,212003,Zhenjiang,Jiangsu;③ Institute of Management Engineering,Shanghai Second Polytechnic University,200062,Shanghai;④ College of Operations Research and Management Science,Qufu Normal University,276826,Rizhao,Shandong,PRC);On the Improved Emmons Conditions for the Total Tardiness Scheduling[J];Journal of Qufu Normal University(Natural Science);2006-02
5 Tang Guochun (Department of Managment);The Analysis of Some Algorithms for the One-Machine Tardiness Problem[J];Journal of Shanghai Second Polytechnic University;1987-02
6 Zhang Yuzhong Wang Zhongzhi Wang Changyu (Institute of Operations Research, Qufu Normal University, Qufu 273165);THE "TRANSFORM LEMMA" AND ITS APPLICATION IN BATCH SCHEDULING[J];Journal of Systems Science and Mathematical Sciences;2002-03
7 Zhang Yuzhong (School of Operations Research and Management Science, Qufu Normal University, Rizhao 276826) Wang Lin (School of Mathematics Science, Qufu Normal University, Rizhao 276826);THE NP-COMPLETENESS OF A NEW BATCH SCHEDULING PROBLEM[J];;2005-01
8 SUN Yu-qin~(1,2),LIU Jian-jun~3(1.Applied Mathematics Department of Tongji University,Shanghai 200092,China;2.Mathematics Department of Xinxiang Normal College,Xinxiang 453000,China;3.Department of Modern Education Technology,Xinxiang Teachers College,Xinxiang 453003,China);A Polynomial Sub Problem of Single-Machine Primary-Secondary Criteria Scheduling Problem 1||T_(max)|∑U_j|[J];Journal of Xinxiang Teachers College;2006-05
9 SUN Yu-qin~1, YUAN Jin-jiang~2(1.Xinxiang Teachers College, Xinxiang 453000, China; 2.Zhengzhou University, Zhengzhou 450052, China);Single Machine Primary-Secondary Criteria Scheduling Problem 1‖∑U_j︱T_(max)with the Jobs' Processing Times Being Agreeable with Their Due Dates[J];Operations Research and Management Science;2004-05
10 Yu Wenci(East China University of Chemical Technology);A Total Order on Job Sets and It's Applications[J];Communication On Applied Mathematics and Computation;1991-02
【Secondary References】
Chinese Journal Full-text Database 7 Hits
1 Sun Xiuping~(1)) Gu Yundong~(2)) Li Hongxing (1)School of Mathematical Sciences,Beijing Normal University,100875,Beijing,China;2)Department of System Science,School of Management,Beijing Normal University, 100875,Beijing,China);MINIMIZE THE MAXIMUM LATENESS WITH WEIGHTED IN A SINGLE MACHINE PROBLEM[J];Journal of Beijing Normal University(Natural Science);2006-05
2 SUN Ye-ping1,TANG Wan-mei1,TANG Guo-chun2(1.College of Mathematics and Computer Science,Chongqing Normal University,Chongqing 400047;2.Institute of Management Engineering,Shanghai Second Polytechnic University,Shanghai 200041,China);A New Proof of the Optimality of Moore-Hodgson Algorithm[J];Journal of Chongqing Normal University(Natural Science Edition);2007-03
3 TANG Guo-chun1,2 (1.Institute of Management Engineering, Shanghai Second Polytechnic University, Shanghai 200041;2.College of Mathematics and Computer Science, Chongqing Normal University, Chongqing 400047, China);A Study of Scheduling Problems to Minimize the Number of Tardy Jobs[J];Journal of Chongqing Normal University(Natural Science);2009-02
4 YU Bin①,WANG Guang-bin①,XU Chun-ming②(① College of Mathematics and Physics,Qingdao University of Science and Technology,266061;② College of Mathematics,Qingdao University,266071,Qingdao,Shandong,PRC);An Interlacing Form Scheduling Problem with a Common Due Window[J];Journal of Qufu Normal University(Natural Science);2007-04
5 LIANG Tian-juan~1 LU Jia~1 TANG Guo-chun~2 (1.College of Mathematics and Computer Science,Chongqing Normal University,Chongqing 400047,P.R.China;2.Institute of Management Engineering,Shanghai Second Polytechnic University,Shanghai 200041,P.R.China);Multi-criteria Constrained Scheduling Problems with Lateness or Tardiness as the First Criterion[J];Journal of Shanghai Second Polytechnic University;2007-03
6 CHEN Xiao-lin1,2(College of Mathematics and Computer Science,Chongqing Normal University,Chongqing 400047,China);The Optimal Algorithm to Minimize the Weighted Number of Late Jobs both for Reverse Agreeability of Processing Times with Weights When a Subset of Jobs Must Be on Time[J];Operations Research and Management Science;2009-03
7 Sun Yeping Tang Guochun College of Mathematics and Computer Science, Chongqing Normal University, Chongqing 400047, China Institute of Management Engineering, Shanghai Second Polytechnic University, Shanghai 200041, China;The Optimality of the KIM Algorithm[J];Or Transactions;2007-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved