Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Yangtze River》 2018-18
Add to Favorite Get Latest Update

Preliminary analysis on water diversion quantity of Water Diversion Project from Three Gorges Reservoir to Hanjiang River

HUANG Huiyong;ZHANG Na;WAN Hui;LI Bo;ZHENG Sidong;Changjiang Survey,Planning,Design and Research Co.,Ltd.;  
The Water Diversion Project from the Three Gorges Reservoir to the Hanjiang River( WDTGH) is the follow-up project of the Middle Route Project( MRP) of South-to-North Water Diversion( SNWD). The determination of water diversion quantity involves the water source area of the Three Gorges Reservoir,the Hanjiang River basin and the water receiving area of the middle route project. and is characterized by wide range of analysis,many influential factors and complex boundary conditions,etc. Based on the prediction on water demand in the water receiving area of MRP in 2030,this paper constructs a water resources joint regulation model of the Three Gorges Reservoir,Danjiangkou Reservoir and the MRP,and determines the water diversion quantity of the diversion project by combined regulation calculation of long series of water resources data. Furthermore,the effects of various diversion schemes are preliminarily analyzed. The method and ideas can provide references for the scale demonstration of WDTGH and other water diversion projects.
【Fund】: 国家重点研发计划项目“长距离输水渠隧系统水力特性及安全高效运行控制研究”(2016YFC0401810)
【CateGory Index】: TV213.4;TV67
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved