Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Yangtze River》 2018-18
Add to Favorite Get Latest Update

Earned value management considering quality and safety factors and its application

HUANG Jianwen;LIU Min;PAN Huimin;MAO Yuchen;LI Yizhou;WANG Xingxia;College of Hydraulic and Environmental Engineering,China Three Gorges University;National Energy Group Dadu River Basin Hydropower Development Co.,Ltd.;Hubei Bidding Co.,Ltd.;Quality Supervision Station of Water Conservancy and Hydropower Project in Xiaogan;  
Traditional Earned Value Management( EVM) model does not include quantitative indexes that measure uncertainty factors such as quality and safety,therefore it is difficult to measure the impacts of such factors on the cost and progress of a project,making the traditional model ineffective and less applicable in project engineering. In order to tackle the problem,we took quality and safety factors into consideration. Based on traditional EVM model,we established an improved EVM model in which safety index is quantitatively evaluated,and quality index is also introduced into the model. As the evaluation indexes,the improved model can be used in analyzing the progress and cost control of a project,determining whether project progress and cost are influenced by these uncertainty factors. We also verified the feasibility of the improved model by deploying it into practice.
【Fund】: 湖北省自然科学基金面上项目(2014CFB670);; 湖北省建设科技计划项目(KJ2016QT012)
【CateGory Index】: TU714
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved