Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Ready-Mixed Concrete》 2015-07
Add to Favorite Get Latest Update

Cause analysis and response of high rise concrete pumping pipe

Hu Xinjun;Nie Hu;Hubei Provincial Institute of Geological Engineering Wuhan City Huaqiang Ready-mixed Concrete Supply Co.,Ltd.;Hubei Lan Hai Ready-mixed Concrete Co., Ltd.;  
Combined with a blocking pipe anomalies in high-rise building, this paper discusses the principle of concrete pump tube jam to primary and secondary reason analysis and comprehensive measures targeted, focused on analysis of the concrete wall pipe overlooked pipeline optimization design and decorate, fi nally carried on the practice experience, hoping to help peers.
【CateGory Index】: TU974;TU755
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 4 Hits
1 Liu Aijun,Zhu Han,Wang Min(Department of Civil Engineering,Tianjin University,Tianjin 300072);Study on the Adhesion Coefficient of Crumb Rubber Concrete[J];Fly Ash Comprehensive Utilization;2007-02
2 Yang Jing\ Yan Shihai\ Xu Xiaorong(School of Civil Engineering, Tsinghua University\ Beijing\ 100084);A STUDY ON THE ADHESION FACTOR OF PUMPABLE CONCRETE AND ITS MEASURING METHOD[J];Industrial Construction;2002-04
3 FENG Yu-guo,SUN Rui-ren,CHEN Wen-cai;The fault tree analysis of mix-matarial blocking pipe to CFG pile with long screwy drill pipe inner pump pressure[J];Construction Mechanization;2004-04
4 YE Hong-zhi;On reasons analysis of pipe blockage in pumping concrete and control measures[J];Shanxi Architecture;2010-21
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved