Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Yellow River》 2016-07
Add to Favorite Get Latest Update

Application of the FEMCA Method in the Risks Evaluation of Construction Supply Chain

QUAN Junhui;School of Water Conservancy,North China University of Water Resources and Electric Power;  
Construction supply chain management has not been fully developed because of the fragmentary,simplicity and temporary ofprojects when compared with supply chain management in manufacturing,so it needs to study the method of combining the construction withsupply chain based on the character of construction. Current studies took the general contractor as the core of the chain,but the differencebetween construction supply chain and manufacture supply chain was cooperation mode. This study established the risk factors set on the basisof the double cores characteristics of construction supply chain,used the FMECA method with the consideration of controllability to evaluate,used the grey correlation coefficient to range,then got the analysis and evaluation of the construction supply chain risks. The example provesthat the risk factors set are scientific and reasonable and the method is feasible and effective.
【CateGory Index】: TU71;F274
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 LI Meiyun;SONG Qiao;Department of Civil Engineering,Henan University of Technology;Department of Civil Engineering,Henan Technical College of Construction;;Risk assessment of construction supply chain based on fuzzy fault tree[J];辽宁工程技术大学学报(自然科学版);2014-07
2 LIU Zhi-qiang1,ZHANG Fang-ming2(1.School of Economic & Management,Hebei University of Engineering,Handan 056038,China;2.Tangshan Normal University,Tangshan 063000,China);Research on the Risks Evaluation of Construction Supply Chain[J];物流科技;2012-01
3 Xiao Wenzhen~1,Liu Zhenyuan~1,Zhong Weihua~2 (1.Institute of Systems' Engineering,Huazhong University of Science and Technology,Wuhan 430074,China; 2.Ertan Hydropower Development Company,Chengdu 610051,China);Multi-level Fuzzy Comprehensive Evaluation of CSC Risk[J];科技进步与对策;2010-19
4 ZHANG Jin-fa(School of Business,Nankai University,Tianjin 300071,China);Application of FMECA in Supply Chain Risk Management[J];物流技术;2009-03
5 LUO Dang~(1,2),LIU Si-feng~1 (1.College of Economics and Management,Nanjing University of Aeronautics and Astronautics, Nanjing 210016,China; 2.North China Institute of Water Conservancy and Hydroelectric Power,Zhengzhou 450011,China);Study on the Method for Grey Incidence Decision-Making[J];中国管理科学;2005-01
6 XIAO Yu, LI Hua (School Economy and Management,Xidian University,Xi'an 710071,China);Improvement on Judgement Matrix Based on Triangle Fuzzy Number[J];模糊系统与数学;2003-02
【Co-citations】
Chinese Journal Full-text Database 9 Hits
1 QUAN Junhui;School of Water Conservancy,North China University of Water Resources and Electric Power;;Application of the FEMCA Method in the Risks Evaluation of Construction Supply Chain[J];人民黄河;2016-07
2 Jiang Feng;Cao Kang;Yang Xubing;College of Petrochemical Engineering,Lanzhou University of Technology;;Risk Evaluation Method of Ocean Platform Based on Triangular Fuzzy Number and AHP[J];甘肃科学学报;2016-03
3 KONG Lingda;LI bei;JIN Wentao;HAN Xiaojuan;China Electric Power Research Institute;School of Control and Computer Engineering, North China Electric Power University;;Data Collection Granularity Selecting in Intermittent Energy Power Generation Based on Grey Incidence Decision[J];中国电机工程学报;2016-09
4 Yunlong Duan;Yiyong Yu;;Research on the Decision Model of Strategic Risk for Innovative Enterprise during the Process of Sustainable Innovation[J];南大商学评论;2016-01
5 LIU Yongai;NIU Xiaocheng;School of Economics and Management,Xi'an Shiyou University;;Risk Identification and Control of Oilfield Ground Engineering Projects Based on Construction Supply Chain[J];西安石油大学学报(社会科学版);2016-01
6 LUO Dang;WU Jialin;CHEN Xiaomeng;North China University of Water Resources and Electric Power;Jinan University;;Risk Assessment of Ice Disaster in the Yellow River Based on Grey Relational Decision Method[J];华北水利水电大学学报(自然科学版);2016-01
7 XU Guo-dong;GUO Peng;LI Xue-mei;JIA Ying-ying;International Business School of Shanxi Normal University;School of Management,Northwestern Polytechnical University;College of Economics and Management,Nanjing University of Aeronautics and Astronautics;;Angle Grey T's Relational Degree and Its Application[J];运筹与管理;2015-06
8 XIE Feng-ping;ZENG Xue-lan;DUAN Yun-yan;School of Mathematics and Information Sciences,Guangxi University;School of Electrical Engineering,Guangxi University;;Priority Method for Complementary Judgement Matrix Based on Interval Rough Number[J];琼州学院学报;2015-05
9 He Bo;Zeng Weiguang;Hubei University of Automotive Technology;;Study on Evaluation of Transportation Package Solutions Based on FUZZY-AHP[J];物流技术;2015-20
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Zhi-qiang1,ZHANG Fang-ming2(1.School of Economic & Management,Hebei University of Engineering,Handan 056038,China;2.Tangshan Normal University,Tangshan 063000,China);Research on the Risks Evaluation of Construction Supply Chain[J];物流科技;2012-01
2 YANG Qing1,WANG Zonglin2,LI Sheng1,HAN Jun1(1.College of Resource and Environment Engineering,Liaoning Technical University,Fuxin 123000,China;2.Bureau of Land and Resources,Fuxin Municipal Government,Fuxin 123000,China);Application of fuzzy comprehensive evaluation method on waste dump re-vegetation evaluation[J];辽宁工程技术大学学报(自然科学版);2011-05
3 ZHENG Jun-jie,LIN Chi-feng,ZHAO Dong-an,DING Lie-yun(Institute of Geotechnical and Underground Engineering,Huazhong University of Science and Technology,Wuhan 430074,China);Risk assessment of shield tunnel construction cost using fuzzy fault tree[J];岩土工程学报;2011-04
4 XU Jun-qing,LU Hui-min(College of Civil Engineering,Southeast University,Nanjing 210096,China);Information Flow Model for Construction Supply Chain Based on BIM[J];工程管理学报;2011-02
5 LI Jing1,SUN Yasheng2(1.School of Civil and Hydraulic Eng.Dalian University of Tech.,Dalian 116023,China; 2.China Harbor Engineering Company Ltd.Beijing 100027,China);Application of F-ANP in risk evaluation of offshore wind power projects[J];辽宁工程技术大学学报(自然科学版);2011-01
6 FAN Li-yong (Hebei Administration Institute,Shijiazhuang 050000,China);Study on the Risk Management System of Supply Chain of Construction Enterprises[J];物流科技;2010-04
7 LIU Xiao-yan (Civil Engineering of Southwest Jiaotong University,Chengdu 610031,China);Risk Analysis of Contractor under EPC General Contracting Model[J];交通标准化;2008-05
8 JIN Changhong,LI Qiming;Discussion on Implementing Construction Supply Chain Management in China[J];建筑经济;2008-04
9 LI Wan-qing,LI Hai-tao,MENG Wen-qing (School of Economic and Management,Hebei University of Engineering,Handan 056038,China);A prediction model of the project time risk based on support vector machine[J];河北工程大学学报(自然科学版);2007-04
10 GENG Xue-fei, LIU Kai, WANG De-zhan (School of Traffic & Transportation, Beijing Jiaotong University, Beijing 100044, China);Fuzzy Comprehensive Evaluation of SC Risk[J];物流技术;2007-08
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved