Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Hydroelectric Engineering》 2012-04
Add to Favorite Get Latest Update

Study on short-term peak load of Xiaolangdi and Xixiayuan cascade hydropower stations

BAI Tao1,CHANG Jianxia1,FANG Jianxi2,HUANG Qiang1,ZHU Xuping2,LIAO Xinyu2(1.State Key Lab Cultivation Base of Northwest Arid Ecology and Hydraulic Engineering, Xi-an University of Technology,Xi-an 710048;2.Hydropower Plant of Xiaolangdi Water Project Construction Administration,Ministry of Water Resources,Henan Jiyuan 454681)  
This papers proposes a concept of power grid peaking involved with Xixiayuan hydropower station that is a daily regulation reservoir with anti-regulation characteristics.The feasibility of such peaking was proved in both theoretical and actual operation aspects,through developing a short-term peaking model for the Xiaolangdi and Xixiayuan cascade plants.Feasible schemes of short-term peaking for these stations were formulated using different impact factors,and they were solved with an accelerating genetic algorithm.The calculations show that the efficiency of water use and power generation can be greatly increased by this peaking technique.Thus,the win-win between power grid dispatching and water dispatching comes true.
【Fund】: 国家重点基础研究发展计划重点资助项目(2011CB403306);; 国家公益性行业科研专项资助项目(201001012 201101043 201101049-01);; 教育部新世纪优秀人才支持计划资助
【CateGory Index】: TV697.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 WU Wei1,ZHOU Jian-zhong1,YANG Jun-jie1,ZHU Cheng-jun1,2 (1.Hydroelectric and Information Engineering College,Huazhong University of Science and Technology,Wuhan 430074,Hubei Province,China;2.China Three Gorges Project Corporation, Yichang 443002,Hubei Province,China);DAY-AHEAD OPTIMIZATION SCHEDULES OF THREE GORGES CASCADE HYDROPOWER STATIONS BASED ON TIME-OF-USE ELECTRICITY PRICE[J];Power System Technology;2005-13
2 Qiu Xinglian ;Dai Guorui(Wuhan University of Hydraulic and Electric Engineering,Wuhan, 430072);ANALYSIS OF REGULATING PEAK CAPACITY TO THREE GORGES HYDROPOWER PLANT[J];INTERNATIONAL JOURNAL HYDROELECTRIC ENERGY;1996-01
3 Sun Zhengyun 1, Pei Zheyi 1, Xia Qing 2 (1.National Electrical Power Dispatching and Communication Center,Beijing 100031; 2.Tsinghua University, Beijing 100084);Analysis of the measures to reduce the discharge loss of a hydropower station for the peak & valley balance in the flood season[J];Journal of Hydroelectric Engineering;2003-04
4 SONG Yang,ZHONG Denghua,ZHONG Wei,HE Wei(Tianjin University,Tianjin 300072);Study on united optimal operation of cascade hydropower plants in electric power market[J];Journal of Hydroelectric Engineering;2007-03
5 Yi Mingwan ;and Dai Jiang;Optimum Peak Load Adjustment for Three Gorge Cascade Station Group[J];CHINA THREE GORGES CONSTRUCTION;1997-07
6 He Li1,Wu Yonggang1,Zhang Yongchuan1,Yu Bo2,Li Hui2(1.Huazhong University of Science and Technology,Wuhan Hubei 430074; 2.China Three Gorges Project Development Corporation,Yichang Hubei 443002);Research On Peak Modulation Modes Of Short-term Scheduling For Cascade Hydropower Stations[J];Water Power;2006-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 HU Xiao-yu et al(Hohai University,National Key Laboratory for Water Resources and Hydraulic Engineering,Nanjing,Jiangsu 210098);Research on Fuzzy Integrated Evaluation Model Based on Projection Tracing and Its Application[J];Journal of Anhui Agricultural Sciences;2011-11
2 CHENG Jian, JIN Ju-liang, ZHANG Li-bing(College of Civil Engineering, Hefei University of Technology, Hefei 230009, China);Application of acceleration parallel genetic algorithm to estimating parameters of storm intensity formula[J];Journal of Safety and Environment;2006-03
3 Yang Xiaohua 1) Yang Zhifeng 1,2) Li Jianqiang 3)( 1)Institute of Environmental Sciences, Beijing Normal University, State Key Laboratory of Water Environment Simulation; 2)Institute of Water Sciences, Key Laboratory for Water and Sediment Sciences Ministry of Education: 100875, Beijing, China;3)Water Resources and Hydropower Planning and Design General Institute, MWR, 100011, Beijing, China);A GRAY CODE HYBRID ACCELERATING GENETIC ALGORITHM AND ITS PROPERTY ANALYSIS[J];Journal of Beijing Normal University(Natural Science);2004-06
4 LIU Jian-guo~1,LIU Jian-hua~2,GUO Hong-guang~1(1.Changchun Normal University,Changchun 130032,China;2.Jilin Environment Research Institute,Changchun 130000,China);Study on Parametric Recognition & Comparison of Improved S-P Model[J];Journal of Changchun Normal University;2006-12
5 ;Weighting Calculation And Self-Adapting Adjustment On Evaluating The Information Interfusion System[J];Sensor World;2006-03
6 JIN Ju liang 1,WEI Yi ming 2,DING Jing 3,FU Qiang 3 (1. College of Civil Engineering, Hefei University of Technology,Hefei 230009,China; 2. Institute of Policy & Management,Chinese Academy of Sciences,Beijing 100080,China; 3. College of Hydro el;Shepard interpolation model for predicting annual runoff[J];Journal of Yangtze River Scientific Research Institute;2002-01
7 XUE Cang-sheng~(1,2),JIN Ju-liang~1,WEI Yi-ming~3(1.College of Civil Engineering, Hefei University of Technology, Hefei230009, China; 2.Hydrology Department of Anhui Province, Hefei230022, China;3.Institute of Policy & Management, Chinese Academy of Sciences, Beijing 100080, China);Projection Pursuit Method for Optimizing Water Resources Project Schemes[J];Journal of Yangtze River Scientific Research Institute;2005-04
8 WU Kai-ya1,JIN Ju-liang2 (1.National Innovative Institute for Public Management and Public Policy,Fudan University,Shanghai 200433,China;2.College of Civil Engineering,Hefei University of Technology,Hefei 230009,China);PROJECTION PURSUIT MODEL FOR EVALUATION OF REGION WATER RESOURCE SECURITY BASED ON CHANGEABLE WEIGHT AND INFORMATION[J];Resources and Environment in the Yangtze Basin;2011-09
9 WANG Huan-kun1,LIU Yi2,YANG Hong-wei1(1.Department of Technical Support Engineering,Academy of Armored Force Engineering,Beijing 100072,China; 2.Military Representation Office of Armored Force Stayed in Shenyang,Shenyang 110000,China);Application of Improved Genetic Algorithm in Configuration of Battle Maintenance Equipment[J];Journal of Sichuan Ordnance;2011-11
10 WANG Zhong-zhu1,WU Xian-liang 1,2,SHA Wei2 1.Key Laboratory of Opto-electric Information Acquisition and Manipulation of the Ministry of Education,Anhui University,Hefei 230039,China;2.School of Electronic Science and Technology,Anhui University,Hefei 230039,China;Optimized Design for Multi-layer Microwave Absorbing Materials Based on Accelerating Genetic Algorithm[J];Journal of Magnetic Materials and Devices;2009-01
China Proceedings of conference Full-text Database 7 Hits
1 YANG Hong-tao~1 LI Jun-song~2 (1 Wuhan Univ.of Technology,Mechanical and Electrical Engin.Institute,Wuhan 430070,China; 2 Zejiang Univ.of Technology,Information and Electron Institute,Hangzhou 310018,China);Theoretic Research into Split-Assembly Solution of BP Network and Its System Development[A];[C];2007
2 JIN Ju-liang, ZHANG Li-bing, HONG Tian-qiu ( College of Civil Engineering, College of Natural Resources and Environmental Engineering, Hefei University of Technology, Hefei 230009, China.;Improved Ideal Interval Method for Comprehensive Evaluation of Environment Quality[A];[C];2006
3 WANG Tao TU Shan LIU Yan College of energy and power engineering,Xi'an jiaotong University,Xi'an 710049,China DONG Bao-guang Electric Studies,Xi'an Design Research Institute for Coal Industry,Xi'an 710049,China;Discussion and Choice on Methods of Controlling Electrical Apex Area[A];[C];2007
4 ZHOU Mingyao1, ZHAO Ruilong2, ZHANG Fengxiang1, JIN Juliang3, XUE Yafeng1 (1. Hydr. Sci. and Engin. Coll., Yangzhou Univ., Yangzhou 225009, China; 2. Water Conservancy Bureau of Suzhou, Suzhou 215001, China; 3 . Civil Engineering Coll., Hofei Industry Univ., Hofei, 230009, China);The Genetic Algorithms for Soil Moisture Forecast In Water-saving Irrigation Rice Field[A];Chinese Society of Agricultural Engineering[C];2005
5 ZHAO Xiao-yong~1 CUI Guang-bai~1 FU qiang~2 (1.Water Resources and Environment College,Hohai University,Nanjing,Jiangsu 210024,China; 2.Hydraulic & Architecture College,Northeast Agricultural University,Harbin,Heilongjiang 150030,China);The application of projection pursuit classification model in benefit evaluating harness of small watershed[A];[C];2007
6 ZHANG Ling-ling, WANG Hui-min, WANG Zong-zhi, HOU Yan-hong (Institute of Application Management Science, Hohai University, Nanjing 210098 ,China; Hefei Industry and Technology University, Hefei 230009, China);Making Sure of Cooperative Factors in Supply Chain Contract of South-to-North Water Transfer Project (SNTP)[A];[C];2004
7 BAI Tao,HUANG Qiang,CHANG Jian-xia State Key Lab Cultivation Base of Northwest Arid Ecology and Hydraulic Engineering, Xi'an University of Technology,Xi'an 710048,;Short-term peaking operation of cascade hydropower stations based on feasible search space optimization in power market[A];[C];2013
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 HUANG Chun-lei , ZHAO Yong-long , GUO Xia-ming (Nanjing Automation Research Institute, Nanjing 210003, China) (Sichuan Electric Power Corporation, Chengdu 610041, China);Short-term Scheduling for Cascade Hydropower Stations Based on Typical Daily Load[J];Dam Observation and Geotechnical Tests;2005-04
2 ZHU Chuntao WU Yonggang LI Binyan (Huazhong University of Science and Technology,Wuhan 430074,China);Short-term Scheduling of Hydro-thermal System via Novel Particle Swarm Optimization[J];Hydropower Automation and Dam Monitoring;2006-06
3 Cat Jianzhang, Cat Huaxiang, Wu DongPing(Control Center Yun'nan Electric Power Group Co Ltd, Kunming 650011, China);CALCULATION METHOD FOR HYDROPOWER STATION'S ABANDONING ENERGY[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-10
4 Wen Quan1 ,Xue N ianhua2 1.Huazhong U niversity of Science & Technology,Wuhan430 0 74,China 2 .Technology Center of State Power Central China Company,Wuhan 430 0 77,China;STUDY ON THE SPILL ELECTRICITY PRICE OF CENTRAL CHINA POWER NET[J];Automation of Electric Power Systems;2001-07
5 Ding Ning,Wu Junji,Zou Yun (Nanjing University of Science and Technology,Nanjing210094.China);RESEARCH OF PEAK AND VALLEY TIME PERIOD PARTITION APPROACH AND TOU PRICE ON DSM[J];Automation of Electric Power Systems;2001-23
6 He Guangyu 1, Shu Yinbiao 2, Pei Zheyi 2, Chen Xueqing 1, Zhou Shuangxi 1, Lei Xiaomeng 2, Wang Zhen 1 (1. Tsinghua University, Beijing 100084, China) (2. National Electric Power Dispatching and Communication Center of China, Beijing 100031, China);ALGORITHM AND APPLICATION OF OPTIMAL DISPATCHING FOR THREE GORGES ELECTRICITY MARKET[J];Automation of Electric Power Systems;2003-06
7 Wang Jinwen 1, Fan Xihui 1, Zhang Yongchuan 1, Zhang Shiqin 2, Yue Yuhua 2 (1. Huazhong University of Science and Technology, Wuhan 430074, China) (2. Fujian Electric Power Dispatching and Communication Center, Fuzhou 350003, China);SHORT-TERM GENERATION SCHEDULING FOR THE PEAK-ENERGY MAXIMIZATION OF LARGE-SCALE HYDROPOWER SYSTEMS[J];Automation of Electric Power Systems;2003-15
8 Wu Wei, Zhou Jianzhong, Zhu Chengjun, Yang Junjie(Huazhong University of Science and Technology, Wuhan 430074, China)(China Three Gorges Project Corporation, Yichang 443002, China);APPLICATION OF NO-ARBITRAGE ANALYSIS THEORY TO THE REGIONAL ELECTRICITY MARKET[J];Automation of Electric Power Systems;2004-24
9 LIAO Sheng-li , CHENG Chun-tian , CAI Hua-xiang , CAI Jian-zhang , WU Dong-ping ( Dalian University of Technology, Dalian 116024, China) ( Yunnan Power Dispatching Center, Kunming 650011, China);Improved Algorithm of Adjusting Discharge Peak by Thermal Power Plants[J];Automation of Electric Power Systems;2006-01
10 Zhou Shuangxi; Yang Bin (Tsinghua University. 100084. Beijing. China);FACTORS OF EFFECT ON THE PERFORMENCE OF GENETIC ALGORITHMS APPLIED TO REACTIVE POWER OPTIMIZATION AND THE METHODS TO PERFECT IT[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1996-07
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved