Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Hydroelectric Engineering》 2013-01
Add to Favorite Get Latest Update

Prestress analysis of prestressed concrete liner based on in-situ monitor data

KANG Jingfu,CUI Shihui(School of Civil Engineering,Tianjin University/Key Laboratory of Coast Civil Structure Safety,Ministry of Education,Tianjin 300072)  
Using in-situ monitor data in flushing tunnel liner of Xiaolangdi reservoir,this paper studies the developments of concrete stress and concrete creep during its prestressing.By establishing a reasonable tensioning procedure and a specific data collecting system,the measured total strain can be decomposed into elastic strains,concrete creep and prestress loss-related strain.The results show that the concrete creep developed over the prestressing period accounts for roughly 24% of the total strain change.Concrete creep is proportional to the existing stress and the loading time t,and it can be expressed as ε=ασt with coefficient α not a constant,but rather a constraint-dependent variable.This study also shows that the concrete stress and stress distribution calculated with a finite element method agree with the in-situ measurements.
【Fund】: 国家自然科学基金(50979068)
【CateGory Index】: TV332
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 KANG Jing-fu1 , HU Yu-ming2 (1. School of Civil Engineering of Tianjin University, Tianjin 300072, China; 2. Reconnaissance Planning and Design Institute of Yellow River, Zhengzhou 450045, China);DETERMINATION OF TENDON SPACING FOR PRESTRESSED COLUMN CASING STRUCTURES[J];Engineering Mechanics;2003-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Yun-tao(Civil Engineering school of Anhui University of Architecture,Hefei 230022);Influence of prediction models selection of shrinkage and creep on analysis results of long-span rigid-frame bridge[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2012-02
2 CAO Zhong-hua,WAN Hai-ying(School of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Control analysis in construction of long-span continuous rigid frame bridges[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2008-01
3 MIAO Yuan-bing 1 , WANG Se-lan 2 , XIA Cai-chu 1 , ZHU He-hua 1(1. Tongji University, Shanghai 200092, China; 2. Shanghai Suzhou Creek Rehabilitation & Construction Co. Ltd., Shanghai 20002, China);Optimization Design of the Long Span Box Floor in Suzhou River Lock Project[J];;2005-01
4 LIANG Ya_ping, WANG Yuan_feng(School of Civil Engineering and Architecture, Northern Jiaotong University, Beijing 100044,China);Creep Analysis of Axially Compressed Concrete Filled Steel Box Members[J];Journal of Northern Jiaotong University;2003-01
5 JIANG Bo,JI Ri-chen(School of Civil Engineering,Lanzhou Jiao tong University,Lanzhou 730070,China);Shrinkage and creep influence analysis of prestressed concrete continuous girder of high-speed railway ballastless track[J];Journal of Henan University of Urban Construction;2010-04
6 CHEN ZI-hua~1, SHAN Liang~2, GUAN FU-ling~1 (1.Department of Civil Engineering of Zhejiang University, Hangzhou310027,China; 2. Yangtze River Scientific Research Institute, Wuhan430010,China);Identification of Concrete Creep Parameters Based on Evolution Programs[J];Journal of Yangtze River Scientific Research Institute;2005-02
7 LI Feng-lan,LUO Jun-li,ZHAO Shun-bo(School of Civil Engineering and Communication,North China Institute of Water Conservancy andHydroelectric Power,Zhengzhou 450011,China);Early Stage Creep of High-strength Concrete of Different Aggregates[J];Journal of Yangtze River Scientific Research Institute;2009-02
8 ZHOU Jiang ping,\ XU Yu feng (Guangdong Guanyue Highway & Birdge Co.,LTD. Guangzhou 510600,China);The clever use of neutro-axis of the girder in the stress measurement of the long span PC cable-stayed birdge[J];Journal of Chongqing Jiaotong Institute;2001-04
9 ZENG Yong,GU An-bang (School of Civil Engineering & Architecture, Chongqing Jiaotong University, Chongqing 400074, China);Exploitation of creep analysis software about concrete filled steel tube arch bridge[J];Journal of Chongqing Jiaotong University;2005-02
10 ZHANG Yong-shui(School of Civil Engineering & Architecture, Chongqing Jiaotong University, Chongqing 400074,China);Analysis of concrete aging effect in long-span RC arch bridge[J];Journal of Chongqing Jiaotong University;2005-04
China Proceedings of conference Full-text Database 9 Hits
1 Ke Min-yong Chen Song Song Zhi-tong Liu Hai-xiang Hong Xiao-lin(Nanjing Hydraulic Research Institute,Nanjing 210029);Mesomechanics Numerical Analysis for Creep of High Strength Concrete[A];[C];2010
2 Xie Shengtao (Beijing University of Technology Architecture and construction college,Beijing,100022);Creep research progresses of Concrete Filled Steel Tubular Arch Bridge[A];[C];2007
3 ZENG Qingxiang~(1,2),HAN Dajian~1 (1.State Key Laboratory of Subtropical Building Science,South China University of Technology,Guangzhou 510640,China; 2.School of Civil Engineering & Architecture,Wuyi University,Jiangmen 529020,China);A REVIEW OF STUDY ON CONCRETE CREEP FOR PRESTRESSED BOX BRIDGES[A];[C];2010
4 ZHANG Yong~1,ZHAO Hong-ling~2,FENG Jin-ji~1,LI Bao-bao~1 (1.The Third Research Institute of Engineering Corps.General Staff of PLA,Luoyang,Henan471023,China; 2.Department of Civil Engineering,Luoyang Institute ofScience and Technology,Luoyang,Henan 471023,China);DISCUSSION ON FOUR STRESSING METHODS FOR PRESSURE DISPERSION ANCHOR CABLES INSTALLATION[A];[C];2011
5 Liu Hong-wei Zhang Ping-jie (Hebei Provincial Communication Survey & Design Research Institute, Hebei Shijiazhuang 050011, China);Practice and Outlook of Bi-prestressed Concrete[A];[C];2005
6 TAO Zhong HAN Lin-hai LIU Wei (School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China);Effects of long-term loads on the behaviors of concrete-filled steel box beam-columns[A];[C];2001
7 WANG Yu-yin~(1,2) HUI Zhong-hua~2,GENG Yue~1 1.School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China; 2.Postdoctoral Research Station,China Railway 13th Bureau Group Co.,LTD,Jilin,Changchun 130033,China;A summarized account of creep in concrete-filled steel tubular members[A];[C];2007
8 GUO Lei ZHU Yue-ming JI Shun-wen CHEN Shou-kai (1.Institute of Hydraulic Structures,Hohai University,Nanjing 210098,China);Analysis on solidification theory for concrete creep at the arch dam[A];[C];2007
9 Liu Haiqing~1,Wu Qiaoyi~1,Li Dong~1,Zhang Junfeng~2 (1 College of Civil Engineering and Architecture,Liaoning Technical University,Fuxin 123000,China; 2 China Emerging Construction Development Corporation,Beijing 100039,China);Analysis on post-tensionging bond prestressed structural carrying capacity of Fuxin Planning Museum[A];[C];2013
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved