The Minimal Expectant Regret Concerned Electric Power Network Planning under Flexible Constraints

ZHAI Hai-bao1, CHENG Hao-zhong1, CHEN Chun-lin2, JIANG Feng-qing2, FANG Ling-feng2(1. School of Electronic, Information and of Electrical Eng., Shanghai Jiaotong Univ., Shanghai 200030, China; 2. Dept. of Development and Planning, Shanghai Municipal Electrical Power Company, Shanghai 200122)  
A multi-scenarios method was used to deal with the uncertainty of electrical source and load. The minimal expectant regret of invest between the expansion plan and the optimal plan in each scenario is defined as the object, and the flexible constraints are also concerned. The penalty function of overloads under N-1 criterion is another object. Based on the case of no original feasible solutions needed and high efficiency, the improved ant colony algorithm is used to solve this problem. The simulation results of an 18-bus system show that this method can, under flexible constraints, give the robust and flexible plan with the least expectant waste of investment.
【Fund】: 国家自然科学基金资助项目(50177017);; 高等学校优秀青年教师教学科研奖励计划资助
【CateGory Index】: TM715
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 CHENG Hao-zhong,FAN Hong,ZHAI Hai-bao(School of Electronic Information and Electrical Engineering,Shanghai Jiaotong University,Shanghai 200240,China);Review of Transmission Network Flexible Planning[J];Proceedings of the Chinese Society of Universities for Electric Power System and Automation;2007-01
2 FAN Hong CHENG Hao-zhong(School of Electronic,Information and Electrical Engineering,Shanghai Jiaotong Univ.,Shanghai 200240,China);Transmission planning models and assessment systems for planning schemes in market environment[J];East China Electric Power;2007-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Wang Mianbin1 Tan Zhongfu1 Zhang Rong2 Wang Chengwen1 Cao Fucheng1 Li Xiaojun1 (1. North China Electric Power University Beijing 102206 China 2. Beijing Jingchuang Xingye Investment Consultants Beijing 100043 China);Risk Evaluation Model of the Power Grid Investment Based on Increment Principle[J];Transactions of China Electrotechnical Society;2006-09
2 Gu Yongdong (Qidong Urban Power Company);Particle Swarm Optimization and Its Use in Transmission Network Expasion Planning[J];Electrotechnical Application;2007-02
3 ;Environmental impact of high voltage transformer station and its assessment[J];Electric Power Environmental Protection;2005-03
4 MO Hua,WANG Meng;Analysis and suggestion on some existing issues about power transmission and transformation EIA[J];Electric Power Environmental Protection;2007-04
5 Huang Baojun 1, Shi Jingnan 2 1. Henan Provincial Electric Power Survey Design Institute, Zhengzhou,450007; 2. Zhengzhou Electric Power Design Institute, Zhengzhou,450003);Study on Economic Appraisal Approach of Power Network Construction[J];Electric Power Construction;2003-02
6 Mao Yubin, Wang Xiuli, Wang Xifan(Xi'an Jiaotong University. 710049. Xi'an. China);GENETIC ALGORITHM FOR THE OPTIMAL MULTISTAGE TRANSMISSION NETWORK PLANNING[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1998-12
7 Xing WeiguD. F. F. IVu(The University of Hong Kong, Hong Kong, China);COST-BENEFIT ANALYSIS OF BOT BASED ON GENERATION EXPANSION PLANNING[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-02
8 Zhu H aifeng1 ,Cheng H aozhong1 ,Zhang Yan1 ,Ma Zeliang2 ,Zhu Zhonglie2 1.Shanghai Jiaotong University,Shanghai2 0 0 0 30 ,China 2 .East China Electric Power Group,Shanghai 2 0 0 0 0 2 ,China;A NOVEL METHOD OF ELECTRIC POWER NETWORK FLEXIBLE PLANNING CONSIDERING THE SELECTED PROBABILITY OF TRANSMISSION LINE[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-17
9 Que Xun,Cheng Haozhong Shanghai Jiaotong University,Shanghai 2 0 0 0 30 ,China;A NOVEL METHOD OF POWER NETWORK PLANNING BASED ON FLEXIBLE CONSTRAINTS[J];Automation of Electric Power Systems;2000-24
10 Cai L ei,Zhang Yan,Cheng H aozhong Shanghai Jiaotong U niversity,Shanghai 2 0 0 2 40 ,China;TRANSMISSION NETWORK PLANNING INCORPORATING TRANSIENT STABILITY[J];Automation of Electric Power Systems;2001-06
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 SUN Qiang1,ZHANG Yun-zhou1,LI Jun1,WANG Le1,ZENG Yuan2(1.State Grid Energy Research Institute,Beijing 100761,China;2.State Power Economic Research Institute,Beijing 100761,China;3.Key Laboratory of Power System Simulation and Control of Ministry of Education,Tianjin University,Tianjin 300072,China);Risk Assessment Application in Power Grid Planning[J];Proceedings of the Chinese Society of Universities for Electric Power System and its Automation;2009-06
2 WANG Yi,CHENG Hao-zhong,HU Ze-chun,WANG Chun(Department of Electrical Engineering,Shanghai Jiaotong University,Minhang District,Shanghai 200240,China);Multi-objective Transmission Expected Value Planning Considering Risk of Overloading[J];Proceedings of the CSEE;2009-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved