Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Shanghai Jiaotong University》 2012-01
Add to Favorite Get Latest Update

Disposal Method of Unequal Settlement of Metro Tunnel in Operation in Shanghai Soft Ground

WANG Xiao-bing,WANG Ru-lu,LIU Jian-hang(Shanghai Shentong Metro Group Co.Ltd.,Shanghai 200070,China)  
In the light of the actual condition of Shanghai very soft water saturated ground and the remedial maintenance of metro tunnel,slight soil disturbance grouting disposal method,which is the renewal of fracture grouting,was performed to treat unequal settlement of Shanghai metro tunnel with relatively simple equipment and easy handling which are suited to local condition of Shanghai.The method was carried out in operated tunnel by use of the accumulative times of nightly stopping of subway operation.The choice of grout technology,grout equipment and grout construction parameters were described.Through the engineering example,this paper detailed the design and construction of this grouting program as well as the result of practice.The results indicate that this method can treat unequal settlement of Shanghai metro tunnel by minimizing soil disturbance induced by grout injection and achieve good compensation effect of ground settlement.
【CateGory Index】: U457
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Wang Rulu;Factors Influencing Deformation of Shanghai Soft Soil Metro Tunnel and Deformation Analysis[J];Underground Engineering and Tunnels;2009-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Zhiliang 1,LIU Tao2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.College of Environmental Science and Engineering,Ocean University of China,Qingdao 266100,China);Research of the impact on surrounding environment of tunnel by shield passing complex areas[J];Sichuan Building Science;2010-03
2 Li Pengcheng(The Second Engineering Co.,Ltd.of CTCE Group,Suzhou 215100,China);Study on Mechanical Behavior and Deformation of Segment Lining in Shield Driven Tunnel[J];Anhui Architecture;2008-05
3 Liao Shaomin et al.;The Latest Progress in Design and Construction of Tunneling in Soft Soil by Shield[J];Underground Space;1998-S1
4 LIN Yong guo et al.(264);A Discussion of the Factors Effecting on Longitudinal Deformation of Subway Tunnel[J];Underground Space;2000-04
5 HUANG Zhong hui et al.(268);Optimization of Segment Joint Position of Shield Tunnel in Soft Ground[J];Underground Space;2000-04
6 DING Chun lin et al.;Comparison of Calculating Methods for Internal Force of Segment Lining for Metro Shield-driven Tunnel[J];Underground Space;2001-03
7 TANG Xuan;A Study on Several Key Topics of Shield Tunnel Lining Design[J];Underground Space;2003-02
8 HUANG Zhong hui;Study on Loading Model of Joints at Longitudinal Seam of Lining Segments in Shield Tunnel[J];Underground Space;2003-03
9 LIN Zhi 1 , HU Xiang-dong 2 (1.The Second Railways Survey & Design Insitute, Chengdu 610031, China; 2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092, China);Multimedia Monitoring and Simulation System for EPB Shield Tunneling in Guangzhou 2nd Metro Line[J];;2005-02
10 YU Zhan-kui 1,2 , HUANG Hong-wei 1 , XU Ling 1 , LI Wen-ting 2 (1. Department of Geotchnical Engineering, Tongji University, Shanghai 200092 P.R.China; 2. College of civil engineering, Shanghai Normal University, Shanghai 201418 P.R.China);A Survey of the Designing Methods for Shield Tunnel in Soft Soil[J];;2005-02
China Proceedings of conference Full-text Database 10 Hits
1 Yuan Yong Liu Tao Liu Xian (Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China);Investigation and evaluation of present state and serviceability of existing river-crossing tunnel[A];[C];2006
2 ~*ZHAO Da-zhou (Yellow River Engineering Consulting Co.,Ltd,Zhengzhou 45000,China);INFLUENCE OF RING JOINT ON INTERNAL FORCES OF SEGMENT LININGS IN SHIELD TUNNELS[A];[C];2010
3 Zhi Bin~1 Qi Mingjun~2 (1.School of Architecture and Civil Engineering,Xi'an University of Science and Technology, Xi'an,710054,Shaanxi,China; 2.Shaanxi Architecture Designing Institute,Xi'an,710003,Shaanxi,China);Analysis of Research Methods for Face Stability at Shield Tunneling[A];[C];2009
4 ;上海电力电缆隧道区间盾构施工若干风险点及对策[A];[C];2009
5 ;外滩通道盾构出洞段施工主要风险控制措施[A];[C];2009
6 ;人民路隧道北线盾构施工难点对策[A];[C];2009
7 ;人民路越江隧道泥水系统在复杂环境条件下应用技术研究[A];[C];2009
8 ;杭州地铁1号线区间盾构进出洞端头地层加固施工技术[A];[C];2009
9 ;杭州地铁1号线高水压条件下深基坑盾构进洞施工技术[A];[C];2009
10 ;盾构隧道管片衬砌设计参数灵敏度及取值研究[A];[C];2009
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved