Influence of Constructing Hand-Dug Piles Closing to Retaining Wall

JIN Guo-long,WANG Yong,GU Kai-yun(China Shipbuilding NDRI Engineering Co.Ltd.,Shanghai 200063,China)  
Based on an engineering case,2D and 3D finite-element tools were employed to analyze the mutual impact of constructing hand-dug piles close to retaining wall.Combined with the analysis data,some measures were implemented.The results show that the hand-dug piles have obvious space arch effect.When the net distance between 3 meter diameter hand-dug piles and retaining wall is 5 meters,only simple design measures are needed to ensure the safety of the foundation pit.
【CateGory Index】: TU472
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Yang Yongkang,Zhang Jichao (School of Civil Engineering,Guangzhou University,Guangzhou 510006,China);Application of the Composite Retaining from Manual Hole Digging Pile and Cement Mixing Pile[J];Chinese Journal of Underground Space and Engineering;2010-S1
2 LI Hui-ying(Guangzhou Municipal Construction Group Co.,Ltd.,Guangzhou,Guangdong 510030,China);Construction Technology of φ3800mm Large Diameter Pile with Manual Digging[J];Construction Technology;2008-01
3 PENG Dong-sheng(Guangdong Province Hangsheng Engineering Co., Ltd., Guangzhou 511442, China);Safe Construction and Relevant Countermeasures for Artificially Excavating Holed Cast-in-Situ Pile[J];Port & Waterway Engineering;2004-06
4 CAI Laibing~(1,2),LI Yongsheng~1,SHI Feng~2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Fujian Academy of Building Research,Fuzhou 350025,China);Bearing Capacity of Hand-Dug Piles Embedded on Granite Residual Clay[J];Journal of Tongji University(Natural Science);2006-01
【Co-citations】
Chinese Journal Full-text Database 4 Hits
1 Jin Guolong,Gu Kaiyun(China Shipbuilding NDRI Engineering Co.,Ltd.,Shanghai 200063,China);Analysis on Impact of Constructing Manual Holing Piles Close to Retaining Wall[J];Chinese Journal of Underground Space and Engineering;2011-S1
2 LIU Si-han(Zhoukou Highway Survey and Design Institute,Zhoukou 466000,Henan,China);Construction Control and Quality Inspection of Drilling Grouting Pile of Magou Bridge[J];Subgrade Engineering;2010-05
3 Chen Min(Fujian Academy of Building Research,Fuzhou,Fujian 350025,China);Analysis and Treatment on Quality Accident of Manual Hole Digging Pile[J];Construction Technology;2008-07
4 Mei Hongliang(China Railway Construction Group Co.,Ltd.,Beijing 100131,China);Construction Technology of Large Sized Rectangle Manual Hole Digging Pile in Xiamen West Railway Station[J];Construction Technology;2011-01
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 WANG Xin-zheng WEI Sheng-lin;The application of manual excavation pile in some big-scale work[J];Shanxi Architecture;2007-21
2 LIU Bi-yan,ZHANG Wei,LI Yi-xing(Wuhan Surveying-geotechnical Research Institute of China Metallurgical Construction Group,Wuhan,Hubei 430080,China);Technical Measures of Manual Excavation Piles in Gravel Strata of Aquifer[J];Construction Technology;2007-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved