Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Computer Engineering and Design》 2001-03
Add to Favorite Get Latest Update

A model of network planning with activity finish-time membership function

CHEN Haoguang, CHEN Qinghua ,YANG Huihu (Institute of Command and technology, Beijing 101416)  
In network planning, for dealing with the uncertainty of activity duration, a finish-time membership function for activity is provided, and a method to get project completion-time membership function is given. In this paper, a sample is adopted to show how to analysis the critical path in network planning with project completion-time membership function.
【CateGory Index】: TP393.07
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 HUANG Zhen-sheng~(1,2),ZHENG Huai-zhou~2,CHEN Hao-guang~2(1.Nanchang Military Academ,Nanchang 330103,China;2.The Academy of Equipment Command and Technology,Beijing 101416,China);The Fuzzy Model for Optimizing the Allocation of Shortening Duration in Network Planning[J];Fuzzy Systems and Mathematics;2006-04
2 LUO Xinggang1 WANG Fubin2 KWONG C K3(1.School of Information,Northeastern University,Shenyang 110819; 2.School of Mechanical Engineering and Automation,Northeastern University,Shenyang 110819; 3.Department of Industrial and System Engineering,The Hong Kong Polytechnic University, Hung Hom,999077 Hong Kong,China);Quality Function Deployment-based Methodology for Optimizing Scalable Product Platform[J];Journal of Mechanical Engineering;2011-12
3 CUI Han-long~1,MENG Wen-qing~1,LI Wan-qing~1,LI Ji-ping~2 (1.College of Civit Engineering,Hebei University of Engineering,Handan Hebei 056038,China) (2.College of Economics Management,hebei University of Engineering,Handan Hebei 056038,China);Analysis of the Critical Path of Fuzzy Network Plan Base on S-type Membership[J];Mathematics in Practice and Theory;2009-07
【Citations】
Chinese Journal Full-text Database 6 Hits
1 Wang Chengyao Gao Lin Wang Dingwei (College of Information Science & Engineering, Northeastern University, Shenyang 110006);SCHEDULING PROBLEMS WITH FUZZY PROCESSING TIMES[J];JOURNAL OF SYSTEMS ENGINEERING;1999-03
2 Huang Decai (College of Information Engineering,Zhejiang University of Technology,Hangzhou 310014) Zhao Keqin (Zhejiang Gold Machine Works, Zhejiang Zhuji 311811);USING THE CONNECTION NUMBER OF THE SPA TO EXPRESS AND PROCESS THE UNCERTAINTIES IN NETWORK PLANNING[J];JOURNAL OF SYSTEMS ENGINEERING;1999-02
3 Li Shuquan Kou Jisong Li Minqiang (Tianjing University, 300072) Zhao Liangying (Agricultural University of Hebei, Baoding 071001);An Approach of Methods in Determining Time Limit for a Project[J];SYSTEMS ENGINEERING ---THEORY & PRACTICE;1997-04
4 Hu Jingsong\ Da Qingli(Institute of Systems Engineering, Southeast University, Nanjing 210096);Analysis of Critical Path in Fuzzy Network with Activites on Nodes[J];SYSTEMS ENGINEERING-THEORY & PRACTICE;1998-08
5 Li Ruogang, Wang Guoxiang, Li Yue and Ren Jialin The Second Academy, CASC, Beijing 100854;Study on Uncertainty of Activity Duration in PERT[J];Systems Engineering and Electronics;1997-08
6 Chen Haoguang, Zhao Hongyu and Chen Qinghua Institute of Command and Technology, COSTIND,Beijing 101407;An Approach of Fuzzy Network Planning Technique Applied into Aerospace Experiment[J];Systems Engineering and Electronics;1999-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 PENG Kun1,XIE Jian-hua2,CAO Bo3(1.Chizhou Power Supply Company,Chizhou 247100,China;2.Lu′an Power Supply Company,Lu′an 237006,China;3.Anqin Power Supply Company,Anqin 246003,China);Application of Load Control System in Demand Side Management of Chizhou Power Supply Company[J];Journal of Anhui Electrical Engineering Professional Technique College;2010-01
2 SONG Xiang-jiong(Physical and Electronic Department,Shaoxing College of Arts and Science,Shaoxing 312000,China);A New Carnot Circulation Efficiency Expression Based on SPA[J];Journal of Anqing Teachers College(Natural Science Edition);2007-02
3 ZHAO Ke-qin(Connection Number Institute of Zhuji, zhuji 311811, China);Application and Basic Principles of Connection Mathematics[J];Journal of Anyang Institute of Technology;2009-02
4 LI Da-wei,ZHAO Wen-jie(Dept.of Special Profession,Aviation University of Air Force,Changchun 130022,China);Damage Effect Evaluation for Airfield Target Based on Network[J];Ordnance Industry Automation;2009-01
5 Wu Wenjun1,Qu Jun2,Hu Xiping3(1.No.91515 Unit of PLA,Sanya 572016,China;2.Dept.of Airborne Vehicle Engineering,Naval Aeronautical & Astronautical University,Yantai 264001,China;3.Administrant Brigade of Postgraduate,Naval Aeronautical & Astronautical University,Yantai 264001,China);Optimization Analysis of Technical Preparation Procedure for Missile Based on PERT Simulation[J];Ordnance Industry Automation;2010-08
6 Ji jie (Beijing Institute of Civil Engineerig and Architecture, Beijing 100044)Hu Changshun (Xi'an Highway University, xi'an 710064);The Heuristic Algorithms of Resource optimization in Highwoy Construction Organization[J];JOURNAL OF BEIJING INSTITUTE OF CIVIL ENGINEERING AND ARCHITECTURE;1999-02
7 ZHONG Ping, LIU Yong (Dept. of P.E., Changsha University of Science and Technology, Changsha 410077, Hunan China);Research on Fuzzy Decision of Lineup Considering Player's Attack and Defense Ability in CBA Basketball Competition[J];Journal of Beijing University of Physical Education;2005-06
8 Li Yumei Li Hongxing(School of Mathematical Sciences,Beijing Normal University,100875,Beijing,China);TOTAL COMPLETION EARLINESS PROBLEM OF SINGLE MACHINE SCHEDULING IN FUZZY ENVIRONMENTS[J];Journal of Beijing Normal University(Natural Science);2006-03
9 SUN Yu-qin~(1,2),ZHANG Zhi-hong~1,SHI Lin~2 (1.Applied Sciences School,UST Beijing,Beijing 100083,China;2.Mathematics and Physics School,UST Inner Mongolia,Baotou 014010,China);The concurrent multimachine scheduling of fuzzy job time being trapezoid fuzzy number[J];Journal of Baotou University of Iron and Steel Technology;2003-04
10 Cheng Lijun Binzhou Teachers College,Binzhou,Shandong, 256604;The Multiobjective Programming Method for Fuzzy Optimization[J];Journal of Binzhou Teachers College;1999-02
China Proceedings of conference Full-text Database 10 Hits
1 Ji-Hui Yang~(1,2) 1 Staff Room of Preparatory Courses,Shenyang Artillery Academy,Shenyang 110161 2 Injury Prevention Research Center Medical College of Shantou University,Shantou 515041;A Brief Description On Fuzzy Relation Programming[A];[C];2008
2 ZHAO Gang~1 TIAN Zhao-Yun~2 ZHANG Qun~1 1.Management School University od science & Technology Beijing,Beijing 100083,China; 2.Management School Beijing University of Aeronautics and Astronautics,Beijing 100083,China.;Study on the fuzzy scheduling for flow shop based on genetic algrithm[A];[C];2004
3 JIANG Zhong-zhong~1 Sheng Ying~2 Wang Ding-wei~3 Yuan yuan~2 (1.School of Business Administration,Northeastern University,Shenyang 110004,China;2.College of Sciences,Northeastern University,Shenyang 110004,China;3.School of Information Science and Engineering,Northeastern University,Shenyang 110004,China);Research on Bi-objective Fuzzy Programming Model and Algorithm of Logistics Distribution Vehicle routing problem[A];[C];2008
4 Jin PENG Institute of Uncertain Systems, Huanggang Normal University, Hubei 438000, China;Fuzzy Ranking and Their Relationships Based on Credibility Theory[A];[C];2006
5 Wang Jie~(1,2) Zhang Xiaojun~1 Zheng Huaichang~(1,3) Li Jinfeng~1 (1.Shandong University of Science and Technology,2.Central South University,3.University of Science and Technology Beijing);Analysis on Safety and Stability of Non-regular Mined-out Area[A];[C];2007
6 Guo Ruilin Liu Yafei Wang Jingshun Mao Guangzhi Liu Yazheng Cui Ruifeng Biological and Food Engineering Faculty, Anyang Institute of Technology, Anyang, 45500;Method of Similarity-difference Analysis Based on The Degree of Grey Incidence[A];[C];2010
7 ZHAO Keqin(Zhejiang Zhuji Research Institute of Connection Mathematics,Zhuji 311811) HUANG Decai(College of Information Engineering, Zhejiang University of technology, Hangzhou 310032)LU Yaozhong(Zhejiang Provincial Transportation Engineering & Construction Group, Hangzhou 310003);Research on the Complexity of Identical - Discrepancy - Contrary (IDC) Network Planning Method[A];[C];2000
8 ZHAO Ke-qin, ZHANG Qing-he ( Institute of Zhuji Connection Number, Zhuji 311811, China; College of Civil Engineering of Huaqiao University, Quanzhou 362021, China);The Research of Harmonizing Development and Application for Identity Discrepancy Contrary System Based on Connection Number[A];[C];2006
9 WANG Quanpeng,WU Bin,LIU Min (Space Medicine Engineering Institute,Beijing,China,100094);Application of Comprehensive Evaluation & Decision-Making Method in Selection of Special Group[A];[C];2009
10 ZHAO Keqin (Institute of Zhuji Connection Mathematics,Zhuji,China,311811);The Application of Connection Number A + Bi in the Fuzzy Multiple Attribute Decision Making[A];[C];2009
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Haitao1,HE Yabo2(1.Department of Architectural Engineering,Jianghan University,Wuhan 430056,China;2.School of Civil and Architectural Engineering,Wuhan University,Wuhan 430072,China);A new calculating method of fuzzy network[J];Sichuan Building Science;2007-02
2 HAO Yu long et al(9);Simulation of PERT in Design of Construction Management for Underground Engineering[J];Underground Space;2003-01
3 WANG Ying-lei, XU Zhe (School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083);A Analysis of the Huge Engineering Project's Combined Risk of Schedule and Cost[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2000-04
4 ZHANG Guo-ying~(1,2),SHA Yun~2,LIU Xu-hong~1,LIU Yu-shu~1(1.Department of Computer Science and Engineering, School of Information Science and Technology, Beijing Institute of Technology, Beijing100081, China; 2.Department of Information Technology, Beijing Institute of Petrochemical Technology, Beijing102617, China);High Dimensional Cloud Model and Its Application in Multiple Attribute Evaluation[J];Journal of Beijing Institute of Technology;2004-12
5 Yang Chunde;Zhou Zhongfang(Department of Basic Sciences);Analysis of Fuzzy Network FCPM Method[J];JOURNAL OF CHONGQING UNIVERSITY OF POSTS AND TELECOMMUNICATIONS;1994-01
6 QIN Kun~(1) LI Deyi~(2) XU kai~(1)(1 School of Remote Sensing Information Engineering,Wuhan University,129 Luoyu Road,Wuhan,430079,China;2 China Institute of Electronic System Engineering,6 Wanshou Road,Beijing 100840,China);IMAGE SEGMENTATION BASED ON CLOUD MODEL[J];Journal of Geomatics;2006-05
7 JIANG Gen-mou(School of Civil and Architectural Engineering, East China Jiaotong University, Nanchang 330013, China);Determining the optimal project construction schedule with rsource-based precedence relationships under multiple resource constraints[J];;2005-03
8 LIU Qiao,ZHANG Xi-tong,QU Hong-yan(Department of Management Engineering of Northeast China Institute of ElectriC Power Engineering,Jilin City, 132012);On The Development Tendency MOdern Management[J];Journal of Northeast China Institute of Electric Power Engineering(Natural Science Edition);2004-05
9 Qi Donghai, Wu Yongcun (Department of Civil Engineering, DIT);Design of a General Program for Solving the PERT Networks with Monte Carlo Method[J];;1987-03
10 Wang Nuo, Wang Zhongtuo ( Inst. of Syst. Eng., Dalian Univ. of Technol., China);A novel network planning method: group decision network planning technique[J];JOURNAL OF DALIAN UNIVERSITY OF TECHNOLOGY;1997-01
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 SUN Jin-zhong1,2,CHEN Shi-quan2 (1.School of Management,Beihang University,Beijing 100083,China;2.School of Management,Wuyi University,Jiangmen 529020,China);A Kind of Set-pairs Prediction Method Based on Fuzzy Set-valued Statistics[J];Fuzzy Systems and Mathematics;2009-03
【Secondary Citations】
Chinese Journal Full-text Database 5 Hits
1 Xiong Jingzhu Li Shuquan (Dept. of Civ. Eng. in Agri., Hebei Agri. Univ., Baoding, China);Fuzzy Mathematical Model of Network Schedule Minimum Cost Scheduling[J];Journal of Agricultural University of Hebei;1990-01
2 Zhao Keqin; Zeng Wei (Zhejiang Gold Machine Works);Research of Abstain from Voting Based on the Set Pair Ana-lysis[J];JOURNAL OF DECISION AND DECISION SUPPORT SYSTEMS;1995-03
3 Wu ZhimingTsinghua University, Beijing 100084);The Value and Risk of Time in Network Schedule[J];SYSTEMS ENGINEERING ---THEORY & PRACTICE;1994-05
4 Feng Yuncheng(Beijing University of Aeronautics and Astronautics, 100083);The Critical path Problems of Activity Networks[J];SYSTEMS ENGINEERING ---THEORY & PRACTICE;1994-05
5 ZHAO Kepin zhejiang gold machine works zhuji 311811);DISPOSAL AND DESCRIPTION OF UNCERTAINTIES BASED ON THE SET PAIR ANALYSIS[J];INFORMATION AND CONTROL;1995-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved