Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Cryogenic Technology》 2010-01
Add to Favorite Get Latest Update

Analysis and correction of liquid suspension trouble inlower column resulted from switching over of expander

Qiao Lijuan,Liu Guangzhou,Feng Yongling(Yima Gasification Factory,Coal Gasification Company,Henan Coal Chemicals Group,Yima 472300,Henan,P.R.China)  
At on-line switching-over between home-made expander and imported expander of Model KDONAr-20800/11000/720 air separation plant of Yima Gasification Factory,liquid suspension trouble occurred in the lower column.The trouble is described in details,its causes are analyzed and the correction measures and experience are summarized.
【CateGory Index】: TQ116.11
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved