Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Cryogenic Technology》 2012-01
Add to Favorite Get Latest Update

Configuration features and debugging summarization of 30000 m~3/h air separation plant of Nanjing Iron & Steel Company

Lin Zhiwang,Lan Zhenqiang(Oxygen Generation Factory,Nanjing Iron &Steel United Co.,Ltd.,Dachang District,Nanjing 210035,Jiangsu,P.R.China)  
The technical process,technical parameters and configuration features of 30000 m3/h outer compression process air separation plant of Nanjing Iron Steel Company are briefed,the problems encountered during debugging of the air separation plant and the corresponding corrective scheme are analyzed,and the measures to lower energy consumption for the air separation plant are approached from aspects of heat recovery from self-cleaning filter and air compressor exhaust,and the tubing of molecular sieve purification system and air separation system.
【CateGory Index】: TQ116.11
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved