Full-Text Search:
Home|About CNKI|User Service|中文
Add to Favorite Get Latest Update

Development Design and Commissioning of 2500t/d New Dry Process of Gezhouba Cement Plant

Based on the experiences accumulated from design and commissioning of 2000t/d production line over 20 cases, TCDRI has upgraded the capacity of Φ4m×60m kiln from 2000t/d to 2500t/d. With the ideology of overall optimization and innovation, this technical trial is succeed in the commissioning of No5 kiln in Gezhouba cement plant. The general installation of the line has come up to advanced world level of 1990's.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved