Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Hydrotechnics》 2006-01
Add to Favorite Get Latest Update

On Contract Management in Project Construction Management

SONG Xiao-feng  
Through discussion about earlier stage management,construction management,claim management of contract and cooperation in implement process of contract,the author points out how to make a good job about contract management and how to make further a good job on project construction management.
【CateGory Index】: TU723.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 ;Information System Implementation on Contracts Management[J];Cement Technology;2008-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LIANG Chun-ge~1,FANG Qing-fang~2,GUO Jian-hua~2(1.Guangdong Provincial College for Technical Personnel,Guangzhou 510640,China;2.The Construction Department of Guangdong Government,Guangzhou 510330,China);Innovational study on Partnering model in China[J];Sichuan Building Science;2006-03
2 GUO Jing_juan (School of Economics and Management,Northern Jiaotong University, Beijing 100044, China);Comparative Analysis of Management System on Construction Cost between China and Advanced Countries[J];Journal of Northern Jiaotong University(Social Sciences Edition);2003-01
3 TIAN Zhi-xue, YE Jian, ZHANG Xu(School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083);Project Object Cost and Time Control Reseach[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2001-04
4 OU Xi-xian, LUO Xun(Beijing Institute of Technology, Beijing 100081);An Analysis of Infrastructure Projects Financing Methods[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2004-02
5 YANG Ping,LIU Xian-tao (South-west Petroleum Institute,Chengdu,Sichuan 610500,China);Dynamic Balance Analysis on Credit Crisis in BOT Projects[J];Commercial Research;2005-13
6 DONG Chuan-jie1,WANG Jin2(1.School of Management,Tianjin University,Tianjin 300072,China;2.Tianjin Fanyou Engineering Advice Company,Tiangjin 300072,China);Research on Strategic Partnering in Construction Project[J];Journal of Chongqing Jiaotong University(Social Sciences Edition);2007-02
7 Dong Tongshu (Beijing Bright Golden Bridge Post&Telecommunications Project Management Co., Ltd., Beijing 100037);Consideration on Communication Engineering Construction Project Management[J];Telecom Engineering Technics and Standardization;2006-08
8 Wang Xinkuan (Henan Lixin Electric Power Construction Supervision Limited Company,Zhengzhou,450052);Brief Introduction of FIDIC[J];Electric Power Construction;2002-02
9 RONG Wen-yu,QI Jing,WANG Zhi-yuan (Dept. of Transportation Engineering, Dalian Railway Institute, Dalian 116028, China );Analysis of the Key Problems of Urban Transportation Infrastructure Investment and Financing System[J];Journal of Dalian Railway Institute;2004-02
10 Jia Yonggang (Geoscience College, Ocean University of Qingdao, Qingdao266003) Fang Hongqi (CIGIS of Ministry of Construction, Beijing100007)$$$$;SYSTEM ANALYSIS OF ENGINEERING SUITABILITY OF URBAN GEOLOGICAL ENVIRONMENT IN QINGDAO CITY, CHINA[J];;1999-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved