On Construction Method of Dam Foundation Grouting in Second Fenhe Reservoir

DUAN Jun-cai  
The Second Fenhe Reservoir's dam is a roller compacted concrete dam.Its site is located on the south-west plunging side of Xuanquansi anticline and between the F9 fault and F10 fault.The karstification in dam foundation is faint and the main forms are solution hole and fissure,but in dam abutment it is strong.In order to guarantee dam safety and water storage,the curtain and consolidation grouting must be conducted.In this paper,the main construction method and experiments about dam foundation grouting in second Fenhe Reservoir are discussed.