Construction Diversion Design of Expansion Program of First stage Pumping Station in Yumengkou

YAN Hai-1ei  
Construction of cofferdam of hydraulic engineering has bearing on the feasibility and security of hydraulic engineering construction,has direct impact on the construction duration of main project and the engineering costs,and finally affects the social and economic benefits of the engineering.Earth-rock cofferdam construction is adopted during the expansion program of first stage pumping station in Yumengkou,and a 15m high temporary cofferdam is constructed in water.All of these mentioned above have accumulated the experience in the aspect of building high cofferdam in water.
【CateGory Index】: TV551.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved