Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Hydrotechnics》 2011-01
Add to Favorite Get Latest Update

The Calculation Method and Application of Work Quantity of the First Piece of Terrace on Mountaintop in the Loess Hill and Gully Region

LI Sheng-hui LI Ling-feng  
It is extremely vital to accurately calculate the work quantity of every piece of terrace for controlling project investment and organizing construction in comprehensive control project of soil and water conservation.Based on the project of planning and design of tractor-ploughing terrace in Fuxing Village,Liulin County,the caculation method of work quantity of the first piece of terrace on mountaintop in the loess hill and gully region is brought forward in this paper.The construction proves that the calculation result is basically in accordance with actual quantity of works,and can be popularized in the same regions of the loess plateau.
【CateGory Index】: S157
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved