Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Technology Supervision in Petroleum Industry》 1994-08
Add to Favorite Get Latest Update

Determining Prediction Equation of Drilling Cost

The cost bank for the 7th Five-year plan period of Shengli Oil Field is analysed by using quality management method. The primary and secondary factors affecting the drilling cost have been found. Corresbonding ways of controlling the drilling cost and forecast formula for quantitatively evaluating the drilling cost have been set up.
【CateGory Index】: TE22
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved