Engineering Safety Assessment Procedure for Reventing Fracture Initiation of Piping Flaws

Xu Hong; Li Peining  
Based on the FAD,the engineering safety assessment procedure for pre-venting fracture initiation of piping flaws is established. Fracture failure analysisis treated using plastic collapse load modified by a multiplying factor U. The deter-imining method for U is simple and easy. The table between allowable flaw sizes andapplied stresses is set up. One example shows that this procedure is applicable.
【CateGory Index】: TQ055.810.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 Qian Chengwen,Niu Guozan et al;Risk-based Inspection and Assessment of Pipeline[J];油气储运;2000-08
2 Engineer Liu Yongjian Engineer Xu Guoliang Senior Engineer Qin Jiangyang (Dushanzi Petrochemical General Plant);Safety Assessment of Processing Piping Containing Overdimensioned Flaws for Reforming Plant[J];石油化工设备;1997-01
【Citations】
Chinese Journal Full-text Database 1 Hits
1 ;Introduction of ASME IWB-3650 Piping Flaw Procedure[J];压力容器;1993-06
【Co-citations】
Chinese Journal Full-text Database 9 Hits
1 SHI Yunqing,ZHU Mingyan;Optimization Design of the Geometric Construction of the New Style Local Strengthening Pipe under High-pressure Condition[J];现代机械;2012-03
2 LI Qian-qian,ZHANG Ju-wei(Liaoning Shihua University,Liaoning Fushun 113001,China);Study on Simplified Factors – based Assessment Method for Pressure Piping Containing Defects[J];当代化工;2011-09
3 LIANG Wen-jun1, CHEN Po2, SHENG Shui-ping1, JIN Zhi-jiang2, CHEN Hai-yun1, WANG Xiao-fang2(1.Hangzhou Special Equipments Inspection & Testing Institute,Hangzhou 310003, China;2.Institute of Chemical Machinery Engineering, Zhejiang University, Hangzhou 310027,China);Limit Load Numerical Analysys of Pressure Pipe with Incomplete Welding Defects[J];轻工机械;2008-05
4 HAN Shu-xin1,ZHENG Xiang-yu2,JIN Zhi-jiang2,XIA Fu-yong1,WEI Xin-hua1,WANG Xiao-fang2(1.Hangzhou Special Equipments Inspection & Testing Institute,Hangzhou 310003,China;2.Institute of Chemical Machinery & Equipment,Zhejiang University,Hangzhou 310027,China);Safety Test Research of Pressure Pipes Containing Incomplete Welding Defects[J];轻工机械;2008-04
5 Fan XianzhenGuangzhou Institute of Boiler and Pressure Vessel Supervision and Inspection Guangzhou, 510050Liu YidongHeyuan Institute of Boiler and Pressure Vessel Supervision and InspectionHeyuan, 517000;Application of Defect Assessment in In-service Ammonia Pipelines[J];化工设备与管道;2005-03
6 TU Shandung 1,2 , YU Jiuyang 3 (1.College of Mechanical Engineering, East China University of Science and Technology, Shanghai 200237,China; 2.College of Mechanical Engineering, Nanjing University of Technology, Nanjing 210009,China; 3 .Departmen;Some aspects of fundamental studies in advanced manufacturing technology of process industries[J];武汉化工学院学报;2002-01
7 Li Ming Hu Zhaoji(Nanchang University, 330029 Nanchang)Li Peining(East China University of Science and Technolige,Shanghai 200237);Analysis of the Failure Models and Defects Assessment Methods for Cracked Piping[J];江西化工;2000-03
8 Zhou Jianqiu Zhang Weihua College of Mechanical Engineering, Nanjing University of Chemical Technology, Nanjing,210009,China;FATIGUE LIFE COMPUTATION METHOD OF PRESSURE PIPELINE CONTAINING DEFECTS[J];南京化工大学学报(自然科学版);2000-03
9 南京化工大学 沈士明 赵建平;The Progeress on the Safety Assessment Technologies of Pressure Piping[J];压力容器;1999-06
【Co-references】
Chinese Journal Full-text Database 5 Hits
1 Zhou Ming He Fengqi Ma Baiyong(Shanghai University) (Nuclear Power Institute of China);NONDESTRUCTIVE TESTING METHODS FOR INSERVICE OIL PIPELINES[J];无损检测;1999-01
2 Sun Dongbo, Zhang Xiuli, Wei Xin, Shen Zhuoshen, Li Huiqin;Defects of Protecting Layer of Long ?distance Pipeline and Monitoring Technology[J];石油化工腐蚀与防护;1998-03
3 ;The Investigations of Elastic-plastic Fracture and Failure Analysis of Lack of Penetrations[J];压力容器;1995-05
4 Xu Hong; Li Peining;Engineering Safety Assessment Procedure for Reventing Fracture Initiation of Piping Flaws[J];石油化工设备;1995-03
5 Senior Engineer Li Siyuan;A Safety Assessment of one Side Welded Circumferential Weld Cantaining Incomplete Penetration Defects in Pipeline Subject to Low and Medium Prssure[J];石油化工设备;1993-02
【Secondary References】
Chinese Journal Full-text Database 6 Hits
1 YU Shu-rong;MA Meng;GUO Xiao-lu;School of Petrochemical Technology,Lanzhou University of Technology;;Risk-Based Inspection Technology Model for Marine Riser and Application[J];石油化工设备;2013-05
2 WU Guang(Nanjing Chemical Construction Co.Ltd.,Nanjing 210044,China);Risk Analysis of Transportation Pipeline System[J];石油化工设备;2013-03
3 WANG Ying;Jiangsu Special Equipment Safety Supervision Inspection Institute;;Application of Risk Based Inspection in Industry Pipelines[J];石油化工设备;2012-S1
4 CHEN Wei-ke,MA Fa-ping(Tianjin University of Technology,Tianjin 300384,China);Failure possibility analysis of buried gas pipelines by the risk-based inspection (RBI)[J];天然气工业;2009-08
5 HUANG Yong WANG Kai-quan(College of Environmental and Safety Engineering,Jiangsu Polytechnic University Changzhou,Jiangsu 213164);Life Circle Management of Equipment Based on RCM and RBI and Its Application[J];工业安全与环保;2008-10
6 YU Xichong, ZHAO Jinzhou et al;Corrosion Influence Factors Analysis Using Neural Network for Injecting Pipeline[J];油气储运;2003-03
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ;Generation Cause and Safety Evaluation of Cracks Found in Cirth Welding of Cr5Mo Conduct Pipeline in Gaoqiao Refinery[J];压力容器;1992-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved