Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Railway Occupational Safety Health & Environmental Protection》 2009-01
Add to Favorite Get Latest Update

Integrated Supervising and Controlling Hot-water Heating System

LI Xian-yu(Fengtai Architecture Department,Beijing Railway Bureau,Beijing 100070,China)  
Integrated supervising and controlling system was exploited in order that automatic level of heating system of Fengtai railway heating plant.It is used that GPRS communication technology,trace mode,RTU and supervising controlling software for heating system.It runs steadily and realizes expectation objects.Average 12.6% heat could be saved when the supervising and controlling system was tested within some time and from a certain range,furthermore it was beneficial for equipment safety,facility operation and control.
【CateGory Index】: TU832
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved