Analysis of the Time Value of Fund in Graphical Evaluation and Review Technique Network

Cai Bin Mi Yingying (College of Hydroelectric Engineering)  
On the basis of graphical evaluation and review technique network model, this paper concentrates on the time value of fund and searches the solution of the cost parameter. First, it makes use of the analytics of signal flow scheme theory. Second, it makes use of simulation analytics of simulation technology. Besides, taking the generating unit installation for the left bank power house of the Three Gorges Project for example, the cost of generating unit installation is researched.
【CateGory Index】: TU723
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Wu ZhimingTsinghua University, Beijing 100084);The Value and Risk of Time in Network Schedule[J];系统工程理论与实践;1994-05
【Co-citations】
Chinese Journal Full-text Database 9 Hits
1 HAN Shang-yu1,LI Hong2,HONG Bao-ning3,4(1.College of Engineering and Architecture,Nanchang Hangkong University,Nanchang 330063,China;2.Nanchang University College of Science and Technology,Nanchang 330029,China;3.Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering,Hohai University,Nanjing 210098,China;4.Geotechnical Research Institute,Hohai University,Nanjing 210098,China);Risk analysis method for project duration of highways during construction period and its application[J];岩土工程学报;2013-S1
2 JIANG Hong-bo;Schedule Risk Management of Engineering Project[J];襄樊职业技术学院学报;2007-04
3 OUYANG Bin1,WANG Lin2,HUANG Jing-dong2(1. China Academy of Transportation Sciences, Beijing 100029, China;2. China Planning and Design Institute for Water Transportation, Beijing 100007, China);Study on Project Schedule Risk Analysis in Harbour Engineering[J];水运工程;2005-01
4 WANG Ren-chao, OUYANG Bin, CHU Chun-chao (Civil Engineering Institute of Tianjian University, Tianjin 300072,China );Monte Carlo Simulation of Project Network Planning and Schedule Risk Analysis[J];计算机仿真;2004-04
5 Wu Haogang 1 ,Cui Liuqing 2 ,Sun Xiheng 1 (1.Department of Water Resources and Hydropower Engineering,Tianjin University,Tianjin300072,China;2.Tianjin Nankai Subbranch,China Construction Bank,Tianjin300192,China);Optimum Cash-flow Analysis of Risk Model for Multiple Resources Optimization[J];水利水电技术;2001-12
6 ;A fuzzy judgement model and method applied in network scheduling for managing uncertainty[J];计算机工程与设计;2000-02
7 Chen Haoguang, Zhao Hongyu and Chen Qinghua Institute of Command and Technology, COSTIND,Beijing 101407;An Approach of Fuzzy Network Planning Technique Applied into Aerospace Experiment[J];系统工程与电子技术;1999-04
8 Tang Dianfeng(Sec.Cons.Eng.corp.of Benxi st.and Ir.Corp.,Benxi,117022,China) Qin Guijuan(Dept.of Civ.Eng.,Shenyang Arch.and Civ.Eng.Inst.,Shenyang,110015,China);Analogy system for controlling quality time cost of construction projects[J];沈阳建筑工程学院学报;1998-02
9 Cai Bin Mi Yingying (College of Hydroelectric Engineering);Analysis of the Time Value of Fund in Graphical Evaluation and Review Technique Network[J];武汉水利电力大学学报;1998-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved