Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Modern Urban Transit》 2018-09
Add to Favorite Get Latest Update

Innovative implementation and engineering application of clock subsystem for transit integrated monitoring

Deng Min;  
This paper firstly introduces the background and overall framework of the clock subsystem. Based on the overall framework, the software and hardware framework of the system is planned. It mainly introduces the working principle of the clock subsystem, including the timing strategy, the subscription/issuing system and the realization process of the clock subsystem, and points out the important role of the clock subsystem in the urban rail transit integrated monitoring system for safe operation of urban rail system. In conclusion, based on the demonstration application of the system on Nanjing Qilin tram line 1, it displays the operation and maintenance interface of the clock subsystem in the actual engineering project.
【CateGory Index】: U231.6
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved