Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Modern Urban Transit》 2018-09
Add to Favorite Get Latest Update

Study on modern tram overpass bridge scheme

Wu Xianying;  
Aiming at the problems in tram overpass bridge construction, an optimal design for engineering practice is selected for 4 overpass bridge schemes from the aspects of cost-effectiveness, urban planning, structural safety, construction difficulty, landscape requirements and traffic impact etc. The analysis results show that when tram needs to pass the existing overpass bridge, small overpass bridges should be taken as the priority with a consideration of demolition for new construction or widening rehabilitation, while bypass plan is better for the medium and large overpass bridges.
【Fund】: 国家科技支撑计划项目(2015BAG198B00)
【CateGory Index】: U442.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved