Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Modern Urban Transit》 2018-09
Add to Favorite Get Latest Update

Application of freezing method in red sandstone stratum of Lanzhou metro

Li Qingyu;Zhang Jian;Yue Peng;  
Based on the freezing construction method used in the link channel from Wulipu station to the Eastern Market station in the 14th working area on Lanzhou metro line 1, this paper analyzes the application effect of the freezing method construction technology in the Lanzhou red sandstone stratum, and provides the technical parameters obtained from some constructions for future similar construction reference.
【CateGory Index】: U231.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved