Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Southwest China Normal University(Natural Science Edition)》 2008-04
Add to Favorite Get Latest Update

Elementary Application of the Local Cast Concrete Hollow Floor Slab

HUANG Wen-bing YUAN Yong-jun The Department of Capital Construction Logistics,Southwest University,400715  
The local cast concrete hollow floor slab is formed by a permanent core mold which is become by high strength thin-walled tube embedded into the concrete.This floor slab's structure breaks the tradi- tional mode.It makes the building concentrative loading force beam into countless scattered special loading force hollow rib whose pressed power's form is like the chinese character"工",so it makes the floor mechanics performance more reasonable.For making the beam be simplified to floor slab,thus the floor effective-storey height is greatly enhanced,at the same time,it can reduce the cost of project.So the appli- cation of this structure will be very broad.
【CateGory Index】: TU755
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 ZHANG Xiang;LIU Jun-jun;XIE Da-jiang;Sichuan Fire Research Institute of MPS;Xiangtan City Planning and Architectural Design Institute;;Fire-resistant performance of cast-in-situ concrete hollow floors with polystyrene foam as pore-forming moulds[J];消防科学与技术;2015-07
2 Pan Yahong;Chen Baodi;Civil Engineering School,Taizhou Vocational and Technical College;Zhejiang Biaoli Construction Group Co. ,Ltd.;;Construction Technology of Thick Large Span Hollow Floor with XPS Block Internal Formwork[J];施工技术;2015-03
3 Ma Zhiliang;Fan Jianbing;Hu Liying;Shanghai Branch of The First Construction Engineering Company Ltd.of China Construction Second Engineering Bureau;;Brief Discussion on Construction Technology for Cast-in-Place Concrete Hollow Floor Slab[J];建筑施工;2014-07
4 CHEN Xiaohong;WANG Panxiu;XUAN Weihong;CHEN Yuzhi;WANG Yao;WANG Yan;Architectural Engineering Institute Jinling Institute of Technology;;Research on the Mechanical Properties of New Concrete Hollow Slab[J];科技创新导报;2013-28
【Citations】
Chinese Journal Full-text Database 4 Hits
1 SONG Ji-rong1,3, ZHONG Sheng2,3, GUO Yao-huang31.College of Civil Engineering,Southwest Jiaotong University,Chengdu Sichuan,610031;2.College of business Administration,Sichuan University,Chengdu Sichuan,610064;3.College of Economy Administration,Southwest Jiaotong University,Chengdu Sichuan,610031;Study on the Bidding Evaluation Mode with Bill of Quantities[J];西南师范大学学报(自然科学版);2007-02
2 WANG Xiao-hui(Hunan Yongda construction engineering Co.,Yongzhou,Hunan 425006,China);The Technology of GBF Cast-in Site Concrete Hollow Floor Slab Without Beam and Its Application[J];南华大学学报(自然科学版);2005-03
3 Wang Jun1 and Zhu De sheng2(1.Guizhou Ethnic Institute, Guiyang 550000;2.Qingdao Jimo Fire Brigade, Jimo 266000 );Several Problems of GBF Hollow Nongrider Storied Building Cover[J];青岛建筑工程学院学报;2004-02
4 PENG Li-ying 1,HUANG Yue-nan 1,LI Shu-lin 2,LI Long-mou 3 (1.Dept.of Civil Eng.,Hunan Institute of Engineering,Xiangtan 411104,China;2.The Architectural Quantity Control commission of Xiangtan 411100,China;3.Manganese Mineral Company of Hunan Prov;Application and Practice for Technology of GBF Cast-in-site Reinforced Concret Hollow Section Shaped Floor without Beams[J];湖南工程学院学报(自然科学版);2002-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Chong;HAO Tingzhang;China Construction Second Engineering Bureau Co.,Ltd.Shenzhen Branch;;Construction Technology for Concrete Hollow-Core Floor of Foam Filled Block[J];建筑施工;2015-10
2 ;Research on Bidding Evaluation by Score Value under BOQ[J];安徽建筑;2015-01
3 Wang Yongmin;Wuyang Construction Group Co., Ltd.;;Construction Technology for Welding Rebar Cage and Fixed Composite Pipes on Hollow and Beamless Concrete Floor Slab[J];建筑施工;2014-06
4 PEI Xian-li;Zuoquan Engineering Quality Security Supervision Station;;Study on construction technology of large-span and large-section high beam of building engineering[J];山西建筑;2013-34
5 Fang Guangxiu;Zheng Hongjun;Quan Hong;Yuan Xiyong;Yanbian University of Technology;Jilin Tianyu Group;;Design and Construction of the Side Support GBF Composite Thin-walled Tube Cast-in-place Concrete Hollow Slab[J];施工技术;2013-20
6 HE Jing,SONG Ji-rong,ZHANG Dong-qing(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,P.R.C.);Credit rating system of construction enterprise based on the reasonable low price method in tecruits to bid[J];西南民族大学学报(自然科学版);2010-04
7 CUI Yue ZHAO Li YANG San-chao;Quality control of GBF pipe cast-in site concrete hollow floor[J];山西建筑;2009-05
8 Zhang Baokui,Ma Qingzhen;Study of determination method of the evaluated lowest bid price[J];铁路工程造价管理;2009-01
9 HUANG Wen-bing YUAN Yong-jun The Department of Capital Construction Logistics,Southwest University,400715;Elementary Application of the Local Cast Concrete Hollow Floor Slab[J];西南师范大学学报(自然科学版);2008-04
10 YANG Wei-jun1,YU Xiao-bing1,ZHANG Zhen-hao1,Qiu Ze-you2,LIU Cheng-wei1,YIN Ji-hua1(1.College of Bridge and Structure Engineering,Changsha University of Science and Technology,Changsha 410076,China;2.Changsha Great Star New Building Materials Co.,Ltd,Changsha 410006,China);Experimental study on simply supported slab of reinforced concrete stiffening ribbed hollow pipe girderless floor[J];长沙理工大学学报(自然科学版);2007-02
【Co-references】
Chinese Journal Full-text Database 9 Hits
1 ZHANG Zhi-wei,ZHAO Xin,KONG Dan-dan(School of Civil Engineering,Hebei University of Technology,Tianjin 300401,China);FINITE ELEMENT ANALYSIS OF NEW REINFORCED CONCRETE HOLLOW FLOOR[J];低温建筑技术;2011-10
2 WANG Xiao-zhou(Guangdong Communication Polytechnic,Guangzhou 510650,China);Technical and economic analysis of cast-in-place concrete hollow tile floor slab[J];混凝土;2011-03
3 CHENG Hua-an(Shaanxi Construction Engineering Group First Engineering Co.,Ltd.,Xi'an 710068,China);BDF 700 mm thick cast-in-suit concrete hollow floor construction[J];混凝土;2010-08
4 GUO Zhi-bing,LUO Zhao-hui,LIU Sen-sen(Department of Civil Engineering,TIUC,Tianjin 300384,China);Stress Comparison of Cast-in-place Concrete Slabs in Hollow Two-way and Solid[J];天津城市建设学院学报;2008-03
5 HUANG Wen-bing YUAN Yong-jun The Department of Capital Construction Logistics,Southwest University,400715;Elementary Application of the Local Cast Concrete Hollow Floor Slab[J];西南师范大学学报(自然科学版);2008-04
6 Tian Zhong-xi,Wang Guang-jie,Du Ze-chao;Anti-floating Technology of U-Type Mesh in Cast-in-Situ Concrete Hollow Floor[J];重庆建筑;2008-07
7 ;Stability Control of Big-Diameter GBF Hollow Pipe Mould for Cast-in-Place Concrete Hollow-Core Floor Slab 800 mm in thickness[J];建筑施工;2007-05
8 PENG Qibing LI Wei;KEY TECHNIQUES IN CONSTRUCTION OF CAST-IN-PLACE HOLLOW CONCRETE SLAB[J];建筑技术;2005-11
9 ZHU Xinggang;YANG Zheng;Li Tiehe;IN-SITU HOLLOW SLAB USED IN WANGFUJING MANSION[J];建筑技术;2004-05
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 QI Yue;ZHAO Wen-Jun;College of Civil Engineering,Heilongjiang University;;Comparative analysis on cast-in-place concrete hollow plates calculated according to the new and old concrete specification[J];黑龙江大学工程学报;2015-03
2 Zhang Shaobo;Tian Yushuan;Xu Fangbo;China Construction Seventh Engineering Bureau (Shanghai) Corp., Ltd.;;Brief Discussion on Construction Technology for CBM Mandrel Hollow-Core Floor Slab[J];建筑施工;2014-08
【Secondary Citations】
Chinese Journal Full-text Database 5 Hits
1 Wang Jun1 and Zhu De sheng2(1.Guizhou Ethnic Institute, Guiyang 550000;2.Qingdao Jimo Fire Brigade, Jimo 266000 );Several Problems of GBF Hollow Nongrider Storied Building Cover[J];青岛建筑工程学院学报;2004-02
2 FAN Yanyan,LIU Zhenkui,ZHAO Yanlong,MA Weizhen (Civil Engineering College, Lanzhou Jiaotong University, Lanzhou 730070);Application of Fuzzy Comprehensive Evaluation Method on Bid Evaluation in Construction Engineering[J];基建优化;2003-04
3 LEI Lei,TAN Yue-jin (School of Humanities and Management, National University of Defense Technology, Changsha, Hunan 410073, China);A Research on Applicability of Evaluating Methods of Inviting Bidding[J];空军工程大学学报(自然科学版);2003-03
4 Liang Wei etc;Construction Technique of GBF (Plastic Pipe) Cast-in-Place Concrete for Non-Beam and Hollow-Core Slab[J];建筑施工;2002-05
5 PENG Li-ying 1,HUANG Yue-nan 1,LI Shu-lin 2,LI Long-mou 3 (1.Dept.of Civil Eng.,Hunan Institute of Engineering,Xiangtan 411104,China;2.The Architectural Quantity Control commission of Xiangtan 411100,China;3.Manganese Mineral Company of Hunan Prov;Application and Practice for Technology of GBF Cast-in-site Reinforced Concret Hollow Section Shaped Floor without Beams[J];湖南工程学院学报(自然科学版);2002-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved