Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Zhejiang University(Engineering Science)》 2014-01
Add to Favorite Get Latest Update

Life cycle cost assessment for transformer based on incomplete records

TANG Wei;CHEN Ji-xi;WANG Zi-long;ZHENG Jia-jun;GU Xin-jian;Department of Mechanical Engineering,Zhejiang University;  
The life cycle cost(LCC)analysis model of transformer based on the incomplete data recording was proposed.The transformer failure cost calculation method based on the product structure tree was analyzed in the case of deficient fault record shortage.The definition of fault product base set(FPBS)was presented.The self-accurate failure cost calculation process model was established,which would be much more precise along with the increasing records.A lifelong cost calculation software for transformer was developed,which supports evaluation of LCC in bidding by using the proposed algorithm and helps enterprises accumulate product data.Then the situation of life cycle data shortage was gradually improved.A practical case study was provided for testing the proposed algorithm.Results show that the LCC model and system is feasible and effective in solving the problem of transformers total cost in whole life evaluation.
【Fund】: 国家自然科学基金资助项目(51175463);; 国家“863”高技术研究发展计划资助项目(2013AA041304);; 国家“985工程”资助项目
【CateGory Index】: TM41
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 LIU Jian-qiang1,ZHONG Li-hua1,MA Zhong-neng1,QIU Gui-hua2,XIA Cheng-jun2(1.Logistics Center of GPGC,Guangzhou,Guangdong 510630,China;2.School of Electric Power,South China University of Technology,Guangzhou,Guangdong 510640,China);Research on Application of LCAM in Bid Invitation/Evaluation of Transformers[J];Guangdong Electric Power;2011-03
2 LU SHuang,CHEN Hong-bing,XIAO Fu-li(Shanghai Municipal Electric Power Company,Shanghai 200122,China);Research on Application of Life Cycle Asset Management in Materials Procurement[J];East China Electric Power;2010-09
3 XIA Cheng-jun,QIU Gui-hua,HUANG Dong-yan,LU Kai(School of Electric Power,South China University of Technology,Guangzhou 510640,China);Life Cycle Cost Model and Sensitivity Analysis of Power Transformer[J];East China Electric Power;2012-01
4 DU Guo-fu1,LI Ji1,ZHAO Tie-cheng2(1.Institute of Building Environment and Energy Efficiency,China Academy of Building Research,Beijing 100013,China;2.Engineering Construction Development Company of Huayou Beijing Service Corporation,Beijing 100724,China);Software Development of Life Cycle Cost for Heat/Cold Sources of Air-conditioning System[J];Building Science;2011-02
5 SUN Peng1,CHEN Shaohui2,ZHANG Caiqing3(1.Electric Power Research Institute of Yunnan Power Grid,Kunming 650217,China;2.North China Electric Power University’s Postgraduate Workstation of Yunnan Power Grid Company,Kunming 650217,China;3.School of Economics and Management,North China Electric Power University,Baoding,Hebei 071000,China);LCC Assessment on the Best Life Cycle of Substation Equipments[J];Southern Power System Technology;2011-06
6 HAN Tian-xiang,HUANG Hua-wei,LU Yi-chun(Shanghai Electric Power Test & Research Institute,Shanghai 200437, China);Research and application of LCC management technique as in overseas electric power system[J];Shanghai Electric Power;2004-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ;Disscussion on Implementation of LCC Tender of Substation Equipment[J];Anhui Electric Power;2009-03
2 AI Xin,LE Xiao-jiang,SUN Ying-yun(School of Electrical and Electronic Engineering,North China Electric Power University,Beijing 102206,China);Asset management study for future power grids based on the internet of things[J];Journal of Electric Power Science and Technology;2011-04
3 LI Su-hui1,LU Xiao-ming2(1.North China Electric Power University,Beijing 102206,China;2.Jilin Provincial Electric Power Survey and Design Institute,Changchun 130041,China);Application of Life Cycle Cost Analysis in Digital Substation Planning Design[J];Electric Power Construction;2010-02
4 LI Tao,MA Wei,HUANG Xiao-bei (School of Business Administration,North China Electric Power University,Changping District,Beijing 102206,China);Power Transformation Equipment Management Based on Life Cycle Cost Theory[J];Power System Technology;2008-11
5 SHI Jing-nan,HAN Hong-li,XU Tao (Zhengzhou Electric Power Design Institute,Zhengzhou 450012,Henan Province,China);Application of Life Cycle Costs Analysis in Planning Design of Power Transformation Projects[J];Power System Technology;2009-09
6 LIU Jian-qiang1,ZHONG Li-hua1,MA Zhong-neng1,QIU Gui-hua2,XIA Cheng-jun2(1.Logistics Center of GPGC,Guangzhou,Guangdong 510630,China;2.School of Electric Power,South China University of Technology,Guangzhou,Guangdong 510640,China);Research on Application of LCAM in Bid Invitation/Evaluation of Transformers[J];Guangdong Electric Power;2011-03
7 HUA Ding-jian,LIU Jian-hua,YANG Li-jiao(School of Electrical Information Engineering,Changsha University of Science and Technology,Changsha 410114,Hunan,China);Research on Power Transformer Selection Method Based on Life Cycle Cost[J];Electric Switchgear;2012-04
8 SONG Wan-jing1,YAO Jian-gang1,WANG Jue-heng2,XU Cheng-zhuo1,SUN Wen-yan1(1.College of Electrical and Information Engineering,Hunan University, Changsha 410082,China; 2.Electric Power Survey & Design Institute of Hunan Province,Changsha 410007,China);Application of Life Cycle Cost Theory in Main Transformer Selection[J];Proceedings of the Chinese Society of Universities for Electric Power System and its Automation;2012-06
9 LA Yuan,WANG Hong-bin,CHEN Zhong-dong(Guangdong Power Test & Research Institute of Guangdong Power Grid Company,Guangzhou 510600,China);Research and Application of Condition Maintenance Technology of Transformer[J];Transformer;2013-08
10 ZHANG Mo;LIN Feng;YU Jun;WU Meng;State Grid Electric Power Research Institute;;Evaluation and Decision for the Life-cycle Management of Grid Assets[J];Electric Power Information and Communication Technology;2013-08
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 JIANG Yi-min, MA Jun(Shanghai Electric Power Company, Shanghai 200002, China);Analysis of Life Cycle Cost of Transformer[J];Transformer;2006-12
2 PAN Lezhen1,ZHANG Yan1,YU Guoqin2,DU Chenggang2 (1. Department of Electrical Engineering,Shanghai Jiao Tong University,Shanghai 200240,China; 2. Shanghai Municipal Electric Power Company,Shanghai 200122,China);Prediction of electrical equipment failure rate for condition-based maintenance decision-making[J];Electric Power Automation Equipment;2010-02
3 LI Tao,MA Wei,HUANG Xiao-bei (School of Business Administration,North China Electric Power University,Changping District,Beijing 102206,China);Power Transformation Equipment Management Based on Life Cycle Cost Theory[J];Power System Technology;2008-11
4 SHI Jing-nan,HAN Hong-li,XU Tao (Zhengzhou Electric Power Design Institute,Zhengzhou 450012,Henan Province,China);Application of Life Cycle Costs Analysis in Planning Design of Power Transformation Projects[J];Power System Technology;2009-09
5 LU Shi-jun, LI Xiang (School of Economy and Management, North China Electric Power University, Changping District, Beijing 102206, China);Full Life-Cycle Cost Estimation of Substation Project Based on Blind Number Theory[J];Power System Technology;2010-03
6 ;Life Cycle Cost Analysis in Electrical Equipment Management[J];High Voltage Engineering;2003-04
7 MA Jun~1,HAN Tian-xiang~2,YAO Ming~1,YE Hong-bo~3(1.Shanghai Municipal Electric Power Company,Shanghai 200122,China;2.East China Electric Power Test & Research Institute,Shanghai 200437,China;3.Shanghai Extra High Voltage Transmission Company,Shanghai 200063,China);Ex-post evaluation on LCC calculation for Taihe Substation 220 kV GIS retrofit[J];East China Electric Power;2005-12
8 YIN Ke,YU Dong-sheng(Project Team of Asset Life Cycle Cost,East China Grid Company Limited,Shanghai 200002,China);Application of Life Cycle Cost to bid-invitation and purchase of main substation equipment[J];East China Electric Power;2009-03
9 ZHENG Huai,CHEN Hai-bo,YANG Ling-hui,ZHU Zhong-lie,XUE Yu-lan,WAN Bing-cai(Project Team for Asset Life Cycle Management,East China Grid Company Limited,Shanghai 200002,China);Study of life cycle management for transmission and transformation assets[J];East China Electric Power;2009-05
10 WANG Shu-qin,ZHAO Hong-wei,DENG Hong(Assets Life Cycle Management Finance Team,East China Grid Company Limited,Shanghai 200000,China);Study of finance management strategies based on LCM requirements[J];East China Electric Power;2009-07
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved