Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Electric Power》 2001-08
Add to Favorite Get Latest Update

Calculation of Technical Evaluation Factors of Bidding and Its Application

 This paper introduces the conception and calculation of technical evaluation factors of bidding for con-ventional coal-fired generating units; explains the evaluation method of converting technical performance to price in the invitation of bids and equipment procurement and illustrates by example, the practical calculation data of Shen-tou No.2 Power Plant Phase II Project for reference.
【CateGory Index】: TK212.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 SHAN Hong-sheng1,HUANG Ye-zhong2,HUANG Wen-jie2(1.China Huadian Group Advanced Training Center,Beijing 101512,China;2. School of Business Administration,North China Electric Power University,Beijing 102206,China);Study of SMART Criteria Based Evaluation Index System for Thermal Power Equipment Procurement[J];Electrical Equipment;2007-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 SONG Hui-gang(Materials Purchase Company,Tonghua Iron & Steel Group Co.,Ltd.,Tonghua 134003,China);Research on application of evaluating method to equipment bidding procurement[J];Journal of Dalian University of Technology(Social Sciences);2005-03
2 Yan Xuzhong (Electric Power Planning and Design General Institute,Beijing, 100011);A Few Opinions about How to Prepare Boiler Bidding Document Better[J];Electric Power Construction;2001-08
3 YAN Xin-jun (Northwest Electric Power Design Institute,Xian710032,China);Notes about the Bidding Project of Individual Island in Power Plant[J];Electric Power Survey;2003-04
4 Tian Jiefang;Wei Qngchao School of Civil Engineering and Architecture, Beijing Jiaotong University Beijing 100044;A Study on the Method to Assess the Equipment Bidding of Urban Rail Transit Engineering[J];Urban Rapin Rail Transit;2004-03
5 ;Evaluation of World Bank-funded Projects:An Example[J];International Finacing Magajine;2002-08
6 LIANG Zong jing 1 KUANG Yun 2(1 Department of Scientific Research Management,Guangxi Normal University,Guilin 541004 China; 2.Computer Center Guilin College Of Education,Guilin 541001 China);A MODEL OF BIDS FOR PURCHASING EQUIPMENTS BASED ON THE GREY THEORY[J];JOURNAL OF GUANGXI NORMAL UNIVERSITY(NATURAL SCIENCE);2000-02
7 Li Kan Liu Yushu Wang Lei(Department of Computer Science and Engineering,Beijing Institute of Technology,Beijing100081);An Approach for Attribute Reduction Based on Rough Set Theory[J];Computer Engineering and Applications;2002-05
8 DONG Hai-lin~1,REN Xu~2,HU Yu-qing~1 (1.Department of Equipment Command and Management 2.Department of Scientific Research, Ordnance Engineering College,Shijiazhuang 050003,China);Model of Value Engineering in the Bidding Assessment of Weapons Scientific Research Projects[J];Journal of Ordnance Engineering College;2005-03
9 Chen Zhixiang S hen Wenkai(School of Business,Zhongshan University,Guangzhou510275,China);Value Engineering Method Applied in Construction Engineering Equipment Bidding[J];Value Engineering;2004-06
10 ;How to pick out the equipments with the optimum cost in performance in a tender[J];Construction Machinery;2005-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved