Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《China Journal of Highway and Transport》 2003-01
Add to Favorite Get Latest Update

Construction control and control precision goal of long-span steel cable-stayed bridge

HAO Chao 1,2 (1 School of Architectural Engineering, Zhejiang University, Hangzhou 310027, China; 2 Dingsheng Transportation Construction Company of Zhejiang Province, Shaoxing 312069, China)  
Combined with the construction control of Nanjing Second Yangtz River Bridge, the contents and methods of construction control, the control precision goal of long span flat steel box shaped girder cable stayed bridge are discussed in this paper.
【CateGory Index】: U448.27
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved