Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《China Mechanical Engineering(中国机械工程)》 2004-09
Add to Favorite Get Latest Update

Research on Dynamic CAPP System and Its Decision about Manufacturing Resource

Wang Zhongbin 1,2 Wang Ningsheng 3 Chen Yuliu 1 1.Tsinghua University, Beijing,100084 2.China University of Mining and Technology,Xuzhou,221008 3.Nanjing University of Aeronautics and Astronautics, Nanjing,210016  
In order to improve validity of process plans, this paper introduced a kind of dynamic CAPP system integration model. In the process of generating the process plans, the manufacturing resources were reasonably selected by considering the states and capabilities of the manufacturing resources in the job-shop, thus the process plans which had the nicer production instruction capability were generated. During resource decision, resource decision was carried out based on BP neural network, and the preference indices of the manufacturing resources which correspond to each of features were calculated by use of the relevant algorithms, the manufacturing resources were sorted according to the preference indices. The results show the process plans which is generated by the CAPP system can accord with the production situations and the requirements of the shop floor scheduling.
【Fund】: 国家 8 63高技术研究发展计划资助项目 ( 863 -5 11-93 0 -0 0 9)
【CateGory Index】: TH162
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 LI Xiao-Lei, XU Jian-Xin, HUANG Li-Jiang (Northwestern Polytechnical University, Shaanxi Xi'an, 710072, China);Research on Process Decision Making Based on Dynamic Manufacturing Resource Information[J];中国制造业信息化;2008-05
2 JIA Xiu-jie,LI Jian-feng,LI Fang-yi(Research Center of Sustainable Manufacturing, Shandong University,Jinan 250061,China);The Application and Research of Characteristic and Matrix Technology in CAPP System[J];成组技术与生产现代化;2007-04
3 LIU Wei,QIAO Li-hong(Beijing University of Aeronautics & Astronautics,Beijing 100083,China);Research of the Unified Manufacturing Resource Model Supporting Multi-application Systems[J];成组技术与生产现代化;2006-04
【Co-references】
Chinese Journal Full-text Database 9 Hits
1 ZHOU Dan-chen1,YIN Guo-fu2 (1.Inst. of Mechanical Manu. Tech.,China Academy of Eng. Physics,Mianyang 621900,China; 2.Sch. of Manu. Sci. & Eng.,Sichuan Univ.,Chengdu 610065,China);Research on resource sharing service platform oriented to networked manufacturing[J];计算机集成制造系统;2005-06
2 Liu Nanbo,Zhang Linna,Niu Hongbin,Zhao Fengxia;Research on the part information expression and input method in CAPP system[J];现代制造工程;2005-03
3 Ni Zhonghua Jiang Yong Southeast University, Nanjing, 210086;Studying Dynamic Self-organization Manufacturing Resource Model for Networked Manufacturing[J];中国机械工程;2004-20
4 Wang Zhongbin 1,2 Wang Ningsheng 3 Chen Yuliu 1 1.Tsinghua University, Beijing,100084 2.China University of Mining and Technology,Xuzhou,221008 3.Nanjing University of Aeronautics and Astronautics, Nanjing,210016;Research on Dynamic CAPP System and Its Decision about Manufacturing Resource[J];中国机械工程;2004-09
5 WANG Da-kang, LIU Yong-feng, SHI Ya-ning ( College of Mechanical Engineering and Applied Electronics Technology, Beijing University of Technology, Beijing 100022, China );Technological Decision Making in Intelligent CAPP[J];北京工业大学学报;2003-02
6 MAO Yuan1, LIU Jie2, LI Bo-hu2 (1Beijing University of Aeronautics and Astronautics, Beijing 100083, China; 2Second Academy of CAMEC, Beijing 100854, China);Metamodel-Based Modeling Methodology Research of Complex System[J];系统仿真学报;2002-04
7 JIN Xing,CHEN Gang,DONG Jinxiang ( Computer Science and Engineering Department of Zhejiang University, Hangzhou 310027);Scheduling of Activities in Multi-projects Management Model with Resource Constraints[J];计算机工程;2001-09
8 SHENG Bu - yun, LUO Dan, YANG Ming - zhong (School of Mechanical and Electrical Engineering, Wuhan University of Science and Technology, Wuhan 430070, china);Study on decision - making of manufacturing resources in CAPP system[J];机械设计与制造;2001-02
9 Sheng Buyun;A Model for the Integration of the Constantly Changing of Manufacturing Resources of Enterprises[J];武汉汽车工业大学学报;2000-02
【Secondary References】
Chinese Journal Full-text Database 3 Hits
1 KAO Shu-ting,QIAO Li-hong(Advanced Manufacturing Technology and Systems Research Center,School of Manufa cturing Engineering and Automation,Beihang University,Beijing 100191,China);Mapping technology for process dynamic setting by polychromatic sets[J];计算机集成制造系统;2013-05
2 SHU Haisheng,MOU Xiaowei,YU Haohua,ZHAO Gang,JIANG Bin(Intelligent Manufacture Lab,College of Mechanical and Electrical Engineering,Harbin Engineering University,Harbin 150001,CHN);Study of CAD/CAPP based on manufacturing features and manufacturing resource restriction[J];制造技术与机床;2012-03
3 XU Li-na1,QIU Fu-sheng1,2,3,WANG Gong-dong4,CHEN Yan-hai4 (1.Liaoning Key Lab of Digital Process Simulation and Test Technology,Liaoning Shenyang Aerospace University,Liaoning Shenyang 110136;2.Shenyang Aircraft Design & Research Institute,Liaoning Shenyang 110035;3.Department of Engineering Mechanics,Dalian University of Technology,Liaoning Dalian 116024;4.Shenyang Aerospace University,Liaoning Shenyang 110136);Research on estimation method for process resource load index[J];沈阳航空航天大学学报;2011-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved