Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《China Mechanical Engineering(中国机械工程)》 2004-10
Add to Favorite Get Latest Update

Research on Multi-Agent-Based Scheduling Approach for Job Shop Scheduling

Rao Yunqing Xie Chang Li Shuxia Huazhong University of Science and Technology,Wuhan,430074  
To solve the problem of Job-Shop scheduling, a scheduling framework based on multi-agent system was developed, which can create scheduling Gantt Chart automatically. Under this framework, a grouping cooperation mechanism among multi-agents was designed so as to achieve multi-objective optimization for job-shop scheduling and to improve the practicability and effectiveness of optimization algorithms. Meanwhile, the characteristics of various disturbances in job-shop scheduling was analyzed, based on which, the mechanism of dynamic scheduling was achieved. In this way, the flexibility and robusticity of the scheduling system is enhanced. Finally, a case study was provided to validate the proposed scheduling approach.
【Fund】: 国家自然科学基金资助项目 ( 5 0 10 5 0 0 6)
【CateGory Index】: TH166;TP278
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved