Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《China Mechanical Engineering》 2005-07
Add to Favorite Get Latest Update

Serial Sequential Multi-issue Negotiation for Project Scheduling in VE

Li Yingjie Chen Qingxin Chen Xindu Chen Xin Guangdong University of Technology,Guangzhou,510090  
A multi-issue stochastic model, which can describe uncertainties of the durations and costs of activities in the project, was first put forward. Based upon this model, an algorithm which can make schedule and allocate the resources simultaneously in a negotiation way,was then presented at the goal involved with expectations of the activity durations and costs. The implementation of such an algorithm was explained with a simple example. The simulation results show that the model is applicable, and the algorithm is reliable and effective as well.
【Fund】: 国家 863 高技术研究发展计划资助项目(2003AA414023);; 国家自然科学基金资助项目(50085001);; 广东省自然科学基金资助团队项目(20003051)
【CateGory Index】: TH166
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 9 Hits
1 LI Ying-jie1,CHEN Xin-du2,CHEN Xin2 (1.Department of Mechanical and Electronic Engineering,Zhong Kai Agrotechnical College,Guangzhou 510225,China;2.School of Mechanical and Electronic Engineering,Guangdong University of Technology,Guangzhou 510090,China);Knowledge management system for mould and die making enterprise based on ontology[J];Forging & Stamping Technology;2008-03
2 LI Yingjie1,CHEN Qingxin2,CHEN Xindu2,CHEN Xin2(1.Zhongkai Agrotechnical College,Guangzhou 510225,China;2.Guangdong University of Technology,Guangzhou 510090,China);Early-warning Decision Model of the Project Progress Monitoring in Mould and Die Virtual Enterprise[J];Machine Tool & Hydraulics;2008-01
3 LI Ying-jie1,CHEN Qing-xin2,CHEN Xin-du2,CHEN Xin2 (1.Department of Mechatronics Engineering,Zhongkai Agrotechnical College,Guangzhou 510225,China;2.School of Mechatronics Engineering,Guangdong University of Technology,Guangzhou 510090,China);Project scheduling management in collaborative manufacturing[J];Computer Integrated Manufacturing Systems;2007-11
4 ZHANG Sha-qing,CHEN Xin-du,CHEN Qing-xin,CHEN Xin(School of Mechatronics Engineering,Guangdong University of Technology,Guangzhou 510090,China);Stochastic scheduling for multiple mould and die manufacturing projects under uncertainty[J];Computer Integrated Manufacturing Systems;2009-07
5 Zhu Li-xue,Li Ying-jie(Department of mechanical and Electrical,Zhongkai University of Agriculture and Technology,Guangzhou 510225,CHN);CFS-based agile supply chain management and optimization[J];Modern Manufacturing Engineering;2007-08
6 Li Yingjie1 Chen Qingxin2 Chen Xindu2 Chen Xin2 1.Zhongkai Agrotechnical College,Guangzhou,510225 2.Guangdong University of Technology,Guangzhou,510090;Project Control for Virtual Enterprise Collaborative Manufacturing[J];China Mechanical Engineering;2008-08
7 ZHU Li-xue1,2,LUO Xi-wen2(1.Department of Mechanical and Electrical Engineering,Zhongkai University of Agriculture and Technology,Guangzhou 510225,China;2.College of Engineering,South China Agriculture University,Guangzhou 510640,China);VMT-based modeling of virtual enterprise partner selection[J];Journal of Zhongkai University of Agriculture and Technology;2007-02
8 LI Ying-jie1,CHEN Qing-xin2,CHEN Xin-du2,CHEN Xin2(1.Department of Mechanical and Electrical Engineering,Zhongkai University of Agriculture and Technology,Guangzhou 510225,China;2.School of Mechanical and Electrical Engineering,Guangdong University of Technology,Guangzhou 510090,China);Modeling for the project negotiation scheduling problem in virtual enterprise[J];Journal of Zhongkai University of Agriculture and Technology;2007-03
9 LI Ying-jie1,CHEN Xin-du2,NI Ya-pei3,CHEN Qing-xin2(1.College of Mechanical & Electrical Engineering,Zhongkai University of Agriculture and Engineering,Guangzhou 510225,China; 2.School of Mechanical & Electronic Engineering,Guangdong University of Technology,Guangzhou 510090,China; 3.School of Automotive Engineering,Wuhan University of Technology,Wuhan 4730070,China);Research on information integrated and collaborated manufacturing system of mold industry[J];Journal of Zhongkai University of Agriculture and Engineering;2011-01
【Citations】
Chinese Journal Full-text Database 1 Hits
1 SU Zhilong(Guangdong University of Technology,Guangdong, China)CHEN Qingxin CHEN Xin SUN Jian;Negotiation-based Project Planning of Virtual Enterprise for die and Mould[J];China Mechanical Engineering;2002-22
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 LIU Xue-mei,LI Ai-ping(Institute of Advanced Manufacturing Technology,Tongji University,Shanghai 200092,China);Project Management for Rapid Product Development Service[J];Industrial Engineering and Management;2005-05
2 LI Ying-jie,CHEN Qing-xin,CHEN Xin-du,CHEN Xin (Sch. of Mechanical & Electronic Eng., Guangdong Univ. of Tech., Guangzhou 510090, China);Partially parallel multi-issue negotiation for project scheduling in virtual enterprise[J];Computer Integrated Manufacturing Systems;2005-06
3 LI Ying-jie1,CHEN Qing-xin2,CHEN Xin-du2,CHEN Xin2 (1.Department of Mechatronics Engineering,Zhongkai Agrotechnical College,Guangzhou 510225,China;2.School of Mechatronics Engineering,Guangdong University of Technology,Guangzhou 510090,China);Project scheduling management in collaborative manufacturing[J];Computer Integrated Manufacturing Systems;2007-11
4 ZHANG Sha-qing,CHEN Xin-du,CHEN Qing-xin,CHEN Xin(School of Mechatronics Engineering,Guangdong University of Technology,Guangzhou 510090,China);Stochastic scheduling for multiple mould and die manufacturing projects under uncertainty[J];Computer Integrated Manufacturing Systems;2009-07
5 ZHANG Sha-qing1,2,CHEN Xin-du1,CHEN Qing-xin1,CHEN Xin1 ( 1. School of Electromechanical Engineering,Guangdong University of Technology,Guangzhou 510006,China; 2. School of Management, Guangdong University of Technology,Guangzhou 510520,China);Stochastic scheduling for multiple mould and die manufacturing projects based on MPICH2 and parallel Q-learning[J];Application Research of Computers;2010-09
6 Li Yingjie Chen Qingxin Chen Xindu Chen Xin (School of Mechnical and Electronic Engineering, Guangdong University of Technology Guangzhou 510090);PARALLEL MULTI-ISSUE NEGOTIATION ALGORITHM FOR PROJECT SCHEDULING CONSIDERING TIME AND COST ISSUES IN VIRTUAL ENTERPRISE[J];Chinese Journal of Mechanical Engineering;2005-02
7 Li Yingjie1 Chen Qingxin2 Chen Xindu2 Chen Xin2 1.Zhongkai Agrotechnical College,Guangzhou,510225 2.Guangdong University of Technology,Guangzhou,510090;Project Control for Virtual Enterprise Collaborative Manufacturing[J];China Mechanical Engineering;2008-08
8 Zhang Shaqing Chen Xindu Chen Qingxin Chen Xin Guangdong University of Technology,Guangzhou,510090;Stochastic Scheduling Algorithm for Multiple Mould and Die Manufacturing Projects Based on Multi-step Q Learning[J];China Mechanical Engineering;2009-12
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 YANG Jingsong CUI Guangcai(College of Computer Science and Technology of Changchun University of Science and Technology,Changchun 130022);Distribution Method of Planning and Scheduling Based on a Hybrid Genetic Algorithm[J];Journal of Changchun Institute of Optics and Fine Mechanics;2005-03
2 WANG Dan, YANG Xiao chun, WANG Guo ren, YU Ge (School of Information Science & Engineering, Northeastern University, Shenyang 110006,China);Implementation of Partner Selection in Virtual Enterprise Based on Fuzzy-AHP[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2000-06
3 HUANG Min, LI Feng-e, WANG Xing-wei(School of Information Science & Engineering, Northeastern University, Shenyang 110004, China. );PERT Based Risk Evaluation Model for Virtual Enterprise[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2005-09
4 Wang Bin1 Li Xingyuan2 Wang Haoxiong1 GuoGuilian1 (1. Three Gorges University Yichang 443002 China 2. Sichuan University Chengdu 610065 China);Study of the Dual Randomized Modulation Based on Markov Chains[J];Transactions of China Electrotechnical Society;2005-06
5 GUO Ji-wei~1, LIU Gang~1, TANG Guo-qing~1, WANG Ying~2 (1.Electrical Engineering Department of Southeast University, Nanjing 210096, China; 2.State Development and Investment Company, Beijing 100037, China);Markov Decision Process on Electrical Equipments Maintenance Optimization[J];Proceedings of Electric Power System and Automation;2004-04
6 ZHOU Jie GE Jian-zhuang AN Zhi-guo NIU Dong-min (CAD/CAM/CAE Center, Chongqing University);Study on knowledge management platform for mould & die design with ASP.net technology[J];Forging & Stamping Technology;2004-04
7 LI Ying-jie1,CHEN Xin-du2,CHEN Xin2 (1.Department of Mechanical and Electronic Engineering,Zhong Kai Agrotechnical College,Guangzhou 510225,China;2.School of Mechanical and Electronic Engineering,Guangdong University of Technology,Guangzhou 510090,China);Knowledge management system for mould and die making enterprise based on ontology[J];Forging & Stamping Technology;2008-03
8 CHEN Gang,GAO Jie,SUN Lin-yan(School of Management,Xi'an Jiaotong University,Xi'an 710049,China);A Hybrid of Genetic Algorithm and Bottleneck Shifting for Flexible Job Shop Scheduling Problems[J];Systems Engineering;2007-09
9 ZHANG Jing-wen,XU Yu,HE Zheng-wen,CHAI Guo-rong(School of Management,Xi'an Jiaotong University,Xi'an 710049,China);A Review on the Time/Cost Trade-Offs Problem in Project Scheduling[J];Journal of Industrial Engineering and Engineering Management;2007-01
10 ZHANG Ling, GE Shilun(Dept.of Management Eng.,East China Shipbuilding Institute,Zhenjiang Jiangsu 212003 ,China);Selecting Enterprise Partners for Virtual Enterprise Based on Fuzzy Neural Network Method[J];Journal of East China Shipbuilding Institute;2002-05
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 YAO Yan(School of Mechanical and Electrical Enginerring,Shenzhen Polytechnic College,Shenzhen 518055,China);Component PDM system construction for die and mould enterprises[J];Forging & Stamping Technology;2010-01
2 Zheng Jun-xi,Mao Ning,Chen Qing-xin (Faculty of Electromechanical Engineering,Guangdong University of Technology,Guangzhou 510090,China);A Heuristic for Mold Manufacturing Progress Monitoring[J];Industrial Engineering Journal;2009-03
3 LI Qiang1,QIN Bo1,2,BAO Bai-feng2(1.School of Mechanical and Engineering,Inner Mongolia University of Science and Technology,Baotou 014010,China;2.Department of Molding Technology,Baotou Vocational Technology College,Baotou 014030,China);Exploration on mould coordinated manufacturing based on cloud manufacturing[J];Forging & Stamping Technology;2011-03
4 ZHANG Sha-qing1,2,CHEN Xin-du1,CHEN Qing-xin1,CHEN Xin1 (1.School of Mechatronics Engineering,Guangdong University of Technology,Guangzhou 510006,China;2.School of Management,Guangdong University of Technology,Guangzhou 510520,China);Predictive-reactive scheduling algorithm for multiple mould and die projects with uncertain resources availabilities[J];Computer Integrated Manufacturing Systems;2010-12
5 ZHANG Sha-qing1,2,CHEN Xin-du1,CHEN Qing-xin1,CHEN Xin1(1.School of Mechatronics Engineering,Guangdong University of Technology,Guangzhou 510006,China;2.School of Management,Guangdong University of Technology,Guangzhou 510520,China);Dynamic scheduling for multiple mould and die projects based on improved particle swarm optimization[J];Computer Integrated Manufacturing Systems;2011-03
6 CHEN Qing-xin,MAO Ning,LIU Jian-jun,WANG Zong-zhong (Faculty of Electromechanical Engineering,Guangdong University of Technology, Guangzhou,Guangdong 510006,China);Production organization structure and principles of project management for die & mould companies[J];Die & Mould Industry;2008-09
7 Li Yingjie1 Chen Qingxin2 Chen Xindu2 Chen Xin2 1.Zhongkai Agrotechnical College,Guangzhou,510225 2.Guangdong University of Technology,Guangzhou,510090;Project Control for Virtual Enterprise Collaborative Manufacturing[J];China Mechanical Engineering;2008-08
8 Wang Dongqiang Yan Ping Ren Fan Liu Fei State Key Laboratory of Mechanical Transmission,Chongqing University,Chongqing,400044;Research on Extraction and Analysis Models for Job Shop’s Production Progress Information Based on Multi-information[J];China Mechanical Engineering;2010-20
9 Zhang Shaqing Chen Xindu Chen Qingxin Chen Xin Guangdong University of Technology,Guangzhou,510006;Reactive Scheduling for Multiple Mould and Die Projects Based on Improved Multi-objective Particle Swarm Optimization[J];China Mechanical Engineering;2011-10
10 LI Ying-jie1,CHEN Xin-du2,NI Ya-pei3,CHEN Qing-xin2(1.College of Mechanical & Electrical Engineering,Zhongkai University of Agriculture and Engineering,Guangzhou 510225,China; 2.School of Mechanical & Electronic Engineering,Guangdong University of Technology,Guangzhou 510090,China; 3.School of Automotive Engineering,Wuhan University of Technology,Wuhan 4730070,China);Research on information integrated and collaborated manufacturing system of mold industry[J];Journal of Zhongkai University of Agriculture and Engineering;2011-01
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 Mao Ning et al;An Analysis of the Structure and Function of the Collaborative Product Commerce Technology for the Die & Mould Industry[J];Die & Mould Industry;2001-04
2 CHEN Xin(Guangdong University of Technology, Guangzhou,China)CHEN Qingxin HE Hanwu YU Zhaoqin ZHENG Detao SUN Jian;Rapid Reconfiguration and Operation Control Strategy of Agile Manufacturing Chain Based on Internet[J];China Mechanical Engineering;2001-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved