Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《China Mechanical Engineering(中国机械工程)》 2006-S2
Add to Favorite Get Latest Update

Literature Review of Economic Lot Scheduling Problem

Wu Lina Zhou Zhili Wang Yingluo Xi'an Jiaotong University,Xi'an,710049  
Economic lot scheduling problem(ELSP)is a classical problem in production and inven- tory.Since there is few research focused on this problem in China,the model and algorithm to solve ELSP was introduced and the merit and demerit was analyzed concerning to each method.Also,a re- view of recent study was given sorted by the method.
【Fund】: 国家自然科学基金(70371037);; 陕西省自然科学基金(2002G02)
【CateGory Index】: F224
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 Li Zheng-dao1,2,Zhou Hong1(1.School of Economics and Management,Beihang University,Beijing 100191,China; 2.College of Economics and Management,Northwest A & F University,Yang ling 712100,China);Coordination Mechanism of Economic Lot and Delivery Scheduling Problem[J];Industrial Engineering Journal;2012-01
2 LI Tianfeng ZHOU Zhili WU Lina (Xi'an Jiaotong University,Xi'an,China);A Scheduling Algorithm for Economic Lot Schedulings[J];Chinese Journal of Management;2007-04
3 ZHENG Jie(Lanzhou Jiaotong University Transportation College,Lanzhou 730070,China);Algorithm to Solve Model of Economic Lot and Delivery Scheduling Problem on Flexible Flow Line[J];Technology & Economy in Areas of Communications;2012-01
【Co-citations】
Chinese Journal Full-text Database 1 Hits
1 LI Tianfeng ZHOU Zhili WU Lina (Xi'an Jiaotong University,Xi'an,China);A Scheduling Algorithm for Economic Lot Schedulings[J];Chinese Journal of Management;2007-04
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Liu Qiang Li Zhehao Tang Xiaoqing (School of Mechanical Engineering and Automation, Beijing University of Aeronautics and Astronautics, Beijing 100083, China);Development of manufacturing science and engineering and its up-to-date research directions[J];Journal of Beijing University of Aeronautics and Astronautics;2004-04
2 YAN Hao-yun,LI Hong-yu(Management School of Fudan University,Shanghai 200433,China);Production Planning and Control Approach Suitable for MTO Manufacturing[J];Group Technology & Production Modernization;2008-01
3 CHANG Liang feng, LU Zhen, HUANG Xiao yuan (School of Business Administration, Northeastern University, Shenyang 110004, China.;Profit Model and Its Optimization in Supply Chain[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2002-10
4 ZHU Hong~1, GUO Hai-feng~2, HUANG Xiao-yuan~1 (1. School of Business and Management, Northeastern University, Shenyang 110004,China; 2. College of Information Science and Engineering, Shenyang Institute of Techology, Shenyang 110168, China. Correspondent: ZHU Hong, E-mail: Zh7018_-2000 @ sohu.com);Profit Model of Vendor Managed Inventory and Its Optimized Policy[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2004-05
5 LIU Guo-li1,TANG Li-xin1,ZHANG Ming2(1.School of Information Science & Engineering,Northeastern University,Shenyang 110004,China;2.Management & Manufacture Department,Baosteel Co.,Ltd.,Shanghai 201900,China.);A Study on Raw Material Inventory in Iron and Steel Industry[J];Journal of Northeastern University(Natural Science);2007-02
6 Chen Weida Da Qingli (College of Economics and Management, Southeast University, Nanjing 210018);A Multi Machine Job Shop Scheduling for Minimizing the Earliness and Tardiness Penalties[J];Journal of Southeast University;1997-03
7 SHI Weiren,YU Bing ,ZHANG Xing (College of Automation, Chongqing University, Chongqing 400044,China);The Analysis and Implement of Integration Between Andvanced Planning and Scheduling and ERP[J];Journal of Chongqing University(Natural Science Edition);2003-11
8 ZHAO Quan-wu, XIONG Zhong-kai, YANG Xiu-tai(College of Economics and Business Administration,Chongqing University,Chongqing 400030,China);Optimization Study of Single-machine ELSP Under Capability Constraints[J];Journal of Chongqing University(Natural Science Edition);2005-03
9 Xiong Zhongkai;R.C.Leachman;Existence Theorem of Upper Bound Constant of Multiplier for ELSP and An Improved Algorithm[J];JOURNAL OF CHONGQING UNIVERSITY(NATURAL SCIENCE EDITION);1996-04
10 XU Zhuo-long,XIAO Jian-hua (1 Department of Electronic and Information Engineering, Central South Institue, Zhuzhou 412006,China; 2 Department of Compute Science,Hunan Institute of Engeering,Xiangtan 411101,China);Optimal Model and Its Algorithm of Production Scheduling under CIMS[J];Journal of Hunan Insitute of Engineering;2002-01
【Secondary References】
Chinese Journal Full-text Database 5 Hits
1 Li Zheng-dao1,2,Zhou Hong1(1.School of Economics and Management,Beihang University,Beijing 100191,China; 2.College of Economics and Management,Northwest A & F University,Yang ling 712100,China);Coordination Mechanism of Economic Lot and Delivery Scheduling Problem[J];Industrial Engineering Journal;2012-01
2 LIN Yu,LIU Jing-lin,WANG Zhan-zhuang(Department of Management and Economics,Tianjin University,Tianjin 300072,China);The Scheduling Method Research of a Feed Mill Based on JIT[J];Industrial Engineering and Management;2012-06
3 ZHENG Jie(Lanzhou Jiaotong University Transportation College,Lanzhou 730070,China);Algorithm to Solve Model of Economic Lot and Delivery Scheduling Problem on Flexible Flow Line[J];Technology & Economy in Areas of Communications;2012-01
4 WANG Zhi-liang;WANG Yun-xia;BAI Shao-bu;YANG Zheng-yu;;Customer value equilibrium analysis based on customization manufacturing' multi-objective economic lot scheduling[J];Manufacturing Automation;2013-18
5 BO Hong-guang;MA Xiao-yan;WANG Lei;ZHANG Shu-ran;;Study on disruption identii cation method based on information entropy for complex machine tools production process[J];Manufacturing Automation;2014-02
China Proceedings of conference Full-text Database 2 Hits
1 ZHANG Ji-shan Zhang,DING Yi,LU Yong-chang,SONG Li-chong(School of Business Administration,Northeastern University,Shenyang 110819,China);Research on the Method of Economic lot Scheduling Based on Mass Customization[A];[C];2011
2 ZHANG Shu-shan~1,DONG Ying~2,WANG Li~2 (1.Business School,Northeast Normal University,Changchun 130117,China; 2.China First Automobile Works Group Corporation,Changchun 130012,China);Research on the Model of Order-inserting and Scheduling for Lean Advanced Planning and Scheduling in Discrete Manufacturing Industry[A];[C];2013
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved