 |
Design and Application of the Structure of Tianli Wave Breaker Block for Front Paving Section Revetment of Huandaolu, Xiamen |
|
Wang Meiru, Xie Shanwen, Lu Meijun & QiYue(FDINE Tianjin 300222)Cnina Communications First Design Institute of Navigation Engineering |
 |
The Movement Regulation & Renovation Measures for Silty Sediment Close to Jintang Port |
|
Wang Chenghuan(Jintang Port Authority Tangshan 063611) |
 |
Sea-Wave Extreme Estimation Using SatelliteMacro-Wave Remote-Sense Data |
|
Wang Guangyun Zhao Jinping Song rushi(China Communications Second Harbour Engineering Investigation and Design Institute of Wuhan 430071) |
 |
Analysis on Port Construction Condition for Binhai Port |
|
Liu Ye, Shao Shouliang & Fu Zhu(FDINETianjin 300222)China Communications The First Design Institute of Navigation Engineering |
 |
Inquiry on Protection against Earth Fault Fire & Indirec Electric Shock By Surplus Curplus Current Protector |
|
Chang Reizeng(FDINETianjin 300222)China Communications First Design Insitute of Navigation Engineering |
 |
Large deformity Analytic of S.M. W Method |
|
Liu Chunyuan Dou Yuanmin Yan Xikang(Hebei University of Technology. Tianjin. 300132) |
 |
The Three-dimensional Finite Element Analysis of Piled Breasting Dolphin |
|
Zhou Xu Liu Haixiao Zhou Xireng (Tianjin University, 300072) |
 |
The Construction Technology for Sounth Training Dike Section Se of the Phase One Project of Deep Water Channel Engineering,the Mouth of Changjiang River |
|
Li Qili(FDINE Tianjin 300222)China Communications First Design Insititute of Navigation Engineering |
 |
Application of Slipform Construction Technology in Fabrication of Caisson |
|
Yan Shigang Liu erlie(Tianjin University Management College 300072) |
 |
Quality Control for Road & Yard of High Strength Interlock Block |
|
Yan Tongen(ZBHESCTianjin 300222)Zhong Bei Harbour Engineering Supervision Corporation |
 |
A New Model of Dispute Resolution in International Project ——Dispute Review Board |
|
Chen Yongqiang Zhang Shuibo (School of Management, Tianjin University, 300072) |
 |
Dewatering and Drainage Design for Deep Foundation Pit Excavation |
|
Luo Yanjian(The First Institute of Survey and Design of Railway Ministry, Lanzhou 730000) |
 |
The Application of Deep Cement Mixing Pile to Beilun Port Area |
|
Dong Haifeng(Beilun Container Company, Ningbo Port 315800) |
 |
Engineering Geology Feature from the Sectionsof Shiping to Hejin of the Yellow River |
|
Zhou Bingyuan(SHEIDI Wuhan 430071)China Communications Second Harbour Engineering Investigation and Design Institute of Wuhan |
 |
The Establishment of GPS Control Net for the Mainstream of the Minjiang River |
|
Lin Changgeng (The Channel Bureau of Fujian Province Fuzhou 350002) |