Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Port Engineering Technology
FQ: 双月
AD of Publication: 天津市
Lanuage: 中文;
ISSN: 1004-9592
CN: 12-1220/U
YP: 1964
Url: 中交第一航务工程勘察设计院有限公司
Recommended Journals
Port Engineering Technology
2005 -S1
Catalog
Develoment Target & Strategy of Jingtang Harbour District,Jingtang Port LIU Wei-min(Tangshan Port Investment Co.,Ltd.,Tangshan,063611 China)
Thoughts and Measures for Realizing Port Leap Development of Jintang Harbour District DONG Wen-cai,LIU Shu-shen(Tangshan Port Investment Co.,Ltd.,Tangshan 063611,China)
Setting up Scientific Development Sence & Adheringto the Road of Bringing Forth New Ideas for Design ZHU Ji-quan,QIAO Zhan-you(FDINE* Tianjin 300222,China)
Design Conception and Practice of Building Sheet Pile Wharfs in Deep Waters-Development of A New Structure of Covered type of Sheet Pile Wharf LIU Yong-xiu(Communications First Design Institute of Navigation Engineering,Tianjin 300222,China)
A New Type of Wharf Structure the Structure of Semi-covered Type of Deep Water Sheet Pile Wharf Liu Yong-xiu,Wu Li-dan,Li Yuan-yin(Communications First Design Institute of Navigation Engineering,Tianjin 300222,China)
Practice in Construction of Deep Water Sheet-Pile Diaphragm-wall Wharfs in Jingtang Port and Experiential Study DONG Wen-cai(Tangshan Port Investment Co.Ltd.,Tangshan 063611,China)
Jingtang Port,the Large Base for Study & Application of Diaphragm Wall Wharf Structure WANG Cheng-huan(Tangshan Port Investment Co.,Ltd Tangshan,063611 China)
Generation and Study on Proposal of Covered Type of Sheet Pile Wharf YU Yong(Tangshan Port Investment Co.,Ltd.,Tangshan,063611 China)
Calculation Theory and Method for Covered Type of Deep Water Sheet Pile Wharf LIU Yong-xiu,WU Li-dan(FDINE~* Tianjin 300222,China)
Spatial Finite Element Method to Analyze Covered Type Structure of Sheet Piles wharf structure LI Yuan-yin,LIU Yong-xiu(Communications First Design Institute of Navigation Engineering,Tianjin 300222,China)
Structural Design for Reconstruction of Salt Berth in Jingtang Port LI Yuan-yin,LI Xiu-ying,LIU Yong-xiu,WU Li-dan(Communications First Design Institute of Navigation Engineering,Tianjin 300222,China)
Centrifugal Simulation Technique of Soil Mechanics and It's Application to Port Engineering CAI Zheng-yin,LI Jing-lin,XU Guang-Ming,JIAO Zhi-bin(Geotechnical Engineering Department Nanjing Hydraulic Research Institute,Nangjing 210024,China)
Experimental Study of Centrifugal Models to Test Earth Pressure on Coverde Sheet Pile Wharfs CAI Zheng-yin,XU Guang-ming,ZENG You-jin,LI Jing-lin,JIAO Zhi-bin(Geotechnical Engineering Institute of Nanjing Hydraulic Research Institute,Nanjing 210024,China)
Study on Prototype Observation Technique of Semi-covered Type of Sheet Pile Jiao Zhi-bin,Cai Zheng-yin,Wang jian-ping,Li Jing-lin(Naning Hydraulic Research Institute,Nanjing 210024,China)
Working Designs for Large Integral Steel Formwork For Construction of No.32 and No.31 Berths DONG Shao-fa,LI Bao(1.Tianjin Hydraulic Engineering Company Limited,Tianjin 3000742.Tangsnan Port Inverstment Co.Ltd.,Tangshan 063611,China)
Enhancing Deposit Control in Diaphragm Wall Trenches by Improving Slurry WANG Ao,TIAN Zi-min(Tianjin Deep Foundation Engineering Co.Ltd.,Tianjin 300222,China)
Underwater Pouring of Frost-Resistance Concrete for Construction of Large Berths LING Hong,ZHOU Shu-chang(Tianjin Deep Foundation Engineering Co.Ltd.,Tianjin 300222,China)
Construction of Mass Concrete in Winter GUO Kun-feng,ZHAO Qiu-qi(Tianjin Deep Foundation Engineering Co.Ltd.,Tianjin 300222,China)
Method to Rapidly Chiseling off Pile Heads of Diaphragm Walls for No.32 and No.31 Berths WANG Hai-yong,LING Hong(1.Tianjin Hydraulic Engineering Co.Ltd.,Tianjin 30074;2.Tianjin Deep Foundation Engineering Co.Ltd.,Tianjin 300222,China)
Application of Lowering Water Level by Iarge Diameter Well Point to Construction of Berth 31~# and Berth 32~# TIAN ZI-min,YU Ke(Tianjin Deep foundation Engineering Co.,Ltd,Tianjin 300222,China)
Practice of Appliying Steet Pile Cofferdam to Marine Construction YU Cheng-yu(Tangshan Port Investment Co.,Ltd.,Tangshan 063611,China)
Concrete Durability of Sheet Pile Wall & Aiti-corrosion of Rod WANG Cheng-Huan~1,SHEN Li-ming~2(1.Tangshan Port Investment Co.,Ltd.,Tangshan 063611,China;2.Tianjin Deep Foundation Engineering Co.,Ltd Tianjin 300222,China)
Construction Quality Control & Assesment of Covered Type Sheet Pile for Wharf Reforming Project of Jingtang Harbour District ZHANG Jun-ping(The Water Transport Engineering Quality Supervision Station of Hebei Province.Tianjin 300132,China)
Optimizing Measures for Dsign and Construction of Diaphragm Wall Wharfs in Jingtang Harbour District ZHAO Hui,ZHANG Jun-ping~2(Tangshan Port Investment Co.Ltd.,Tangshan 063611,China;2.The Water Transport qngineering Quality Supper vision Station of HebeiProvince.Tianjin 300132,China)
Solution to Scale Error of Projection of Port Coordinate System Based on Helmert Method ZHANG Zhi-wei,TONG Jun(1.College of Communications of Northeast University,Nanjing,Jiangsu 210096;2.China Communications First Design Institute of Navigation Enineering,Tianjin 300222,China)
Supervision for Construction of Berth 31~# and Berth 32~#,Jingtang Harbour District PU Hai-tao,LIU Mei-shan(Tangshan Haigong Gangxing Supervision Engineering Co.Ltd.,Tangshan 063611,China)
Discusion on Common Problems in Quality of Electrical Installation Works and Coordination of Electrical Installation Works with Civil Engineering Works BI Wen-xiang(Tangshan Haigang Gangxing Supervision Engineering Co.Ltd.,Tangshan 063611)
2005 Issues:  [01] [02] [03] [04] [S1]
More Issues:   [1993]   [1994]   [1995]   [1996]   [1997]   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2006]   [2007]   [2008]   [2009]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved