Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
China Harbour Engineering
FQ: 月刊
AD of Publication: 天津市
Lanuage: 中文;
ISSN: 2095-7874
CN: 12-1310/U
YP: 1981
Url: 中国交通建设股份有限公司
Recommended Journals
China Harbour Engineering
2012 -05
Catalog
Experimental Study on Corrosion Resistance Coefficient Evaluating Method of Sulfate Resistance of Cementitious Material GU Kun-peng,WANG Cheng-qi(CCCC Shanghai Third Harbor Engineering Academy of Science Co.,Ltd.,Shanghai 200032,China)
Experimental Study on Concrete Resistance to Chloride Penetration after Freezing-Thawing YE Qi-ye1,DU Nai-hong1,MI Sheng-dong2(1.Tianjin Tanggu District Binhai Construction Engineering Quality Test Centre Co.,Ltd.,Tianjin 300456,China; 2.CCCC Tianjin Port Engineering Institute Co.,Ltd.,Tianjin 300222,China)
Status and Countermeasures of Marine Dumping Ground in Guangdong HE Gui-fang1,2,YUAN Guo-ming1,SHI Ping 2,Qiu Yi-bing3(1.South China Sea Environmental Monitoring Center,SOA,Guangzhou,Guangdong 510300,China;2.South China Sea Marine Engineering and Environment Institute,SOA,Guangzhou,Guangdong 510300,China;3.South China Sea Bureau,SOA,Guangzhou,Guangdong 510300,China)
Typical Test and Research on Blasting Toe-shooting Method in Deep Soft Subgrade JIN Wei1,HE Wei-wei2(1.Shenzhen Haiqin Project Management Co.,Ltd.,Shenzhen,Guangdong 518068,China;2.CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China)
2D Numerical Wave Flume without Reflection based on OpenFOAM ZHANG Bo-jie1,ZHANG Qing-he1,2(1.School of Civil Engineering,Tianjin University,Tianjin 300072,China;2.State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300072,China)
Affecting Factors of Vertical Bearing Capacity of Cast In-Situ Bored Pile CHEN Zhi-yong1,TAO Xu-guang1,SHI Min-sheng2(1.CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China;2.CCCC Tianjin Port Engineering Institute Co.,Ltd.,Tianjin 300222,China)
Application and Finite Element Analysis on Geogrid in the CFG Pile Composite Foundation WANG Jian1,WU Lian-hai1,YUAN Xiao-bo2,ZHOU Jun2(1.The Third Railway Survey and Design Institute Group Corporation,Tianjin 300251,China;2.School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China)
Stability Study of Bucket-based Structure on Horizontal Loading LI Wu1,2,CHEN Su2,CHENG Ze-kun2,CAI Zheng-yin1(1.Nanjing Hydraulic Research Institute,Nanjing,Jiangsu 210029,China;2.CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China)
Land Reclamation Design for Shanghai LNG Terminal Project HUANG Jin-shen,LI Shou-long(CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China)
Experimental Study on Port Concrete Surface Permeability and Durability LI Shu-hua1,YANG Jian-jun2,MI Sheng-dong2(1.Quality and Safety Supervision Bureau of Hebei Province Marine Traffic Engineering,Tianjin 300132,China; 2.CCCC-Tianjin Port Engineering Institute Co.,Ltd.,Tianjin 300222,China)
Options for Durability Design Schemes of Jetty Concrete WANG Miao1,HUO Yue-ji2,TANG Jing-ze3(1.CCCC Water Transportation Consultants Co.,Ltd.,Beijing 100007,China; 2.China Harbor Engineering Co.,Ltd.,Beijing 100027,China; 3.Guangzhou Branch,CCCC Second Harbor Consultants Co.,Ltd.,Guangzhou,Guangdong 511442,China)
Siltation Monitoring in Trial Dredged Channel of Yueqing Bay HUANG Zhi-yang1,DING Jian1,YE Jian-guo2(1.Shanghai Waterway Engineering Design and Consulting Co.,Ltd.,Shanghai 200120,China; 2.Yueqing Bay Harbor District Development and Construction Administration,Yueqing,Zhejiang 325600,China)
Construction Technology for a New Type Quay Wall of Steel Tubular-Sheet Pile Combined Structure ZENG Qing-song,WANG Fu-qiang,XUE Rui-long(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou,Guangdong 510230,China)
Construction Quality Control of Wharf Facing Concrete Doped Cellulose Fiber SUN Qian-ping,LIU Rui-jian,CHEN Yu-hua(No.1 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300456,China)
Application of Prestressed Steel Case in the Integrated Hub Project of Xiangjiang in Changsha YANG Gui-gen,XIA Fang(CCCC Second Harbour Engineering Co.,Ltd.,Wuhan,Hubei 430040,China)
Integral Installing Technology of the Arch Rib in Long-span Concrete-filled Steel Tubular Arch Bridge GUAN Huai-yu,LI Wei(No.1 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300456,China)
Deck-Beam Precambering and Integrating Technology in Steel-Concrete Composite Girder WANG Shi-feng,HUANG Hai-ou,CHEN Chao-hua,SUN Xiao-wei(No.5 Branch of CCCC Second Harbor Engineering Co.,Ltd.,Wuhan,Hubei 430012,China)
Design and Application of New Four Feet Hollow-block Sling ZHAO Chao,LI Chang-suo(No.1 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300456,China)
Keys of Power Distribution Design for Electric Rubber Tyre Gantry YAO Jian-xin(CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China)
Annotation of Shop Drawing in International Port Engineering Project YANG Yi-guan,PAN Xiao-jun(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou,Guangdong 510230,China)
Numerical Stimulation of a Shored Mechanically Stabilized Wall in the Three Gorges Reservoir Area HU Rong1,XU Chao1,ZHU Hong2,LUO Yu-shan1(1.Key Laboratory of Geotechnical and Underground Engineering(Tongji University),Ministry of Education,Shanghai 200092,China;2.Nete Geosynthetics LTD,Yichang,Hubei 443003,China)
Application of Diaphragm Wall Structure & Cofferdam in Dry Construction of Marine Port LIU Xing-an1,LIU Yi-an2,XIA Lin1(1.China Harbor Engineering Co.,Ltd.,Beijing 100027,China;2.Beijing General Municipal Engineering Design & Research Institute,Beijing 100082,China)
2012 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2009]   [2010]   [2011]   [2013]   [2014]   [2015]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved