Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Modern Tunnelling Technology
FQ: 双月
AD of Publication: 四川省成都市
Lanuage: 中文;
ISSN: 1009-6582
CN: 51-1600/U
YP: 1964
Url: 中铁西南科学研究院;中国土木工程学会隧道及地下工程分会
Recommended Journals
Modern Tunnelling Technology
1998 -01
Catalog
Countermeasures against Gas Burst, Ground Deformation and Water Inflow in Construction of Jiazuqing Tunnel Zhang Zhidao (The No. 2 Survey and Design Institute, Ministry of Railways) Bai Jicheng (The No. 5 Engineering Barcau, Ministry of Railways)
Geological Condition and Ground Stress Character for Jiazuqing Tunnel Wang Ke (The No. 2 Survey and Design Institute, Ministry of Railways)
Technology for Predicting Serious Coal Burst in Jiazuqing Tunnel Guan Jian(The No.5 Engineering Bureau, Ministry of Railways)
Coal and Gas Burst Monitoring at No. 18 Coal Layer in Parallel Adit of Jiazuqing Tunnel Guan Jian (The No.5 Engineering Bureau, Ministry of Railways)
Countermeasures against Gas Burst and Construction Control in Jiazuqing Tunnel Tang Quanhui (The No. 5 Engineering Bureau, Ministry of Railways)
Coal Layer Positioning Method in Tunnelling Zhang Yang (The No. 5 Engineering Bureau , Ministry of Railways)
Study on Ventilation Technique in Jiazuqing Tunnel during Construction Zhang Kaixin (The No. 2 Survey and Design Institute, Ministry of Railways)
Application of a "High Level Parallel Adit" in Jiazuqing Tunnel Luo Zipin (The No. 5 Engineering Bureau, Ministry of Railways)
Serious Deformation of Surrounding Rock in Squeezing Ground Yu Yu (The No. 2 Survey and Design Institute, Ministry of Railways)
Main Countermeasures against the Serious Deformation of Surrounding Rock in Jiazuqing Tunnel Gao Shijun (Thr No. 2 Survey and Design Institute, Ministry of Railways)
Application of Long Bolts to Control Serious Deformation of Surrounding Rock in Jiazuqing Tunnel Bai Jicheng Cuan Jian (The No. 5 Engineering Bureau . Ministry of Railways)
Installation of Long Bolts in Jiazuqing Tunnel Li Zrlong (The No. 2 Survey and Design Institute, Ministry of Railways)
Explosion-proof Machinery and Power-Supply System in Jiazuqing Tunnel Chang Bingwen Liu Xingshun (The No. 5 Engineering Bureau, Ministry of Railways)
Safety Concernment and Project Management in Jiazuqing Tunnel Zhang Fenglin (The No. 5 Engineering Bureau, Ministry of Railways)
1998 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2009]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved