Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Hongshui River
FQ: 双月
AD of Publication: 广西壮族自治区南宁市
Lanuage: 中文;
ISSN: 1001-408X
CN: 45-1146/TM
YP: 1982
Url: 广西水力发电工程学会;广西电力工业勘察设计研究院
Recommended Journals
Hongshui River
2009 -03
Catalog
Study on Layout Design for Low-head Hydro-junction in River Channel with Inadequate River Width HE Shan-guo(Guangxi Nanning Institute of Water Conservancy and Hydropower Design,Nanning 530001)
Engineering Technique of Steel Lining Contact Grouting at Jinghong Hydropower Station HU Jing1,LI Yan2(1.Hubei Qingjiang Construction Co.,Ltd,China Gezhouba Group Corporation,Yichang 443002;2.China Gezhouba Group Corporation,Yichang 443002)
Influence of Arch Dam Engineering on Stress ZENG Hao1,LI Hai2,CHEN Yan-xiang2(1.Longtan Hydropower Development Limited Liability Company,Nanning 530028;2.College of Civil Engineering and Architecture,Guangxi University,Nanning 530004)
Concrete Temperature Control for Intake Dam Section of Longtan Hydropower Station WEI Lian-de,LIANG Cong-ning,HU Shang-sheng(Jiangnan Water Resources & Hydropower Engineering Company,Tian'e 547300)
Seepage Analysis on the Downstream of Reservoir at Xiaqiao Hydropower Station and Countermeasures HE Xian-jun(Guangxi Hydroelectric Construction Bureau,Nanning 530001)
Application of Bag Concrete to Left Bank Protection at Naji Hydropower Station LI Ping(Guangxi Hydroelectric Construction Bureau,Nanning 530001)
Test and Study on Effect of Blasting Vibration in Underground Powerhouse Excavation at Xiaowan Hydropower Station QIU Xin,ZHU Bao-fan,ZHANG Chao(Sinohydro Bureau 14 Co.,Ltd,Kunming 650041)
Test Study of Square Column Resistance in Uniform Flow with Finite Depth DENG Shao-yun1,2,QIU Qing-hua1(1.Yili Normal University,Yining 835001;2.HoHai University,Nanjing 210098)
Simulation Study on Temperature Control and Crack Prevention during Construction of Cylindrical Powerhouse for Expansion Project of Dahua Hydropower Station XIE Ling-fei(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Study on Bonding Strength of Horizontal Bedding Joint against High Arch Dam's Bearing Capacity ZHAO Xiao-lian1,ZHANG Zhong-qing2,XIA Yu2(1.College of Resources and Environment,Guangxi University,Nanning 530004;2.College of Civil Engineering and Architecture,Guangxi University,Nanning 530004)
Study on Seepage Influence due to Water Stop System Failure of Concrete Face Rockfill Dam YANG Hai-lin(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Test Analysis on Blasting Vibration in Dam Foundation Excavation of Wanjiakouzi Hydropower Station LUO Xiong-bing(Guangxi Hydroelectric Construction Bureau,Nanning 530001)
Simulation Analysis on Temperature Field and Temperature Stress during Construction and Operation of Release Sluice on the Right Bank of Qiaogong Hydropower Station TIAN Kai,TANG Yu-xing,LIN Yan-zhao(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Gist of Isolated-phase Enclosed Bus Installation at Qiaogong Hydropower Station DENG Yong-gui1,ZHOU You-liang1,ZHANG Hai-feng2,LI Cong-hua3,LI Chun-hong1(1.Qiaogong Hydropower Station Subsidiary of Guangxi Fangyuan Electric Co.,Ltd,Laibin 546119;2.Electromechanical Installation Division of Sinohydro Bureau 7 Co.,Ltd,Pengshan 620860;3.Lushui Multipurpose Project Administration Bureau of Yangtze River Water Resources Committee,Wuhan 437302)
Three Dimensional Simulation and Low-head Operation Stability of Longtan 700MW Turbine Runner YANG Lin,FANG Jing-jia(Longtan Hydropower Plant,Tian'e 547300)
Classification and Mechanical Properties of Surrounding Rocks at Expansion Project of Yantan Hydropower Station WEI Guo-jian,GAO Guang-ting(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Prediction on Disastrous Flood of the Bailong River Based on GM(1,1) LI Jian1,CEN Mei2(1.North Sichuan Electric Power Development Co.,Ltd of CDT,Chengdu 610041;2.Sichuan Qingyuan Engineering Consulting Co.,Ltd,Chengdu 610072)
Structural Analysis and Innovation of Water Filter for Technical Water Supply at Longtan Hydropower Station ZHANG Hong-liang,QI Xiao-li(Longtan Hydropower Plant,Tian'e 547300)
Replacement and Innovation of Bottom Ring for Runner Chamber of Xijin Hydropower Plant YANG Xian-qian(Guangxi Xijin Hydropower Plant,Nanning 530325)
Overview on Bulb Tubular Turbine Generator Design for Jinjitan Hydropower Station LI Qian-qian,ZHU Chun-ying(Hangzhou Jianghe Electromechanical Equipment Engineering Co.,Ltd,Hangzhou 310012)
Proposal and Engineering Design of System Communication for Shanxiu Hydropower Station ZOU Yang(Guangxi T-Energy Engineering Consulting Co.,Ltd,Nanning 530023)
Application of Geogrid to High Slope Filling of Substation CHEN Bo(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Technical Innovation for Mechanical Hydraulic Drive System of Letan Governor LIN Cheng-hai(Guangxi Guiguan Kaitou Power Limited Company,Xincheng 546205)
Analysis on Trip Accident of 220kV Pinglong II Transmission Line WU Ying-wei,ZHANG Wei(Guangxi Pingban Hydropower Development Co.,Ltd,Nanning 530022)
Treatment of Over Vibration in 4# Unit of TSQ-1 Hydropower Station FAN En-xi(TSQ-1 Hydropower Development Co.,Ltd,Xingyi 562400)
Investment Control over Small-scale Hydropower Projects in Guangxi LIU Tao(Hydropower Development Office of Water Resources Department of Guangxi,Nanning 530023)
2009 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1994]   [1995]   [1996]   [1997]   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved